-
Date submitted2023-07-05
-
Date accepted2024-06-03
-
Date published2024-12-25
Complete extraction of conditioned ores from complex-structured blocks due to partial admixture of substandard ores
- Authors:
- Bayan R. Rakishev
The paper presents mining-technological substantiation of complete extraction of conditioned ores from complex-structured blocks of benches by mixing a layer of substandard ores of certain sizes. The relevance of the work consists in the development of innovative methods of establishing the parameters of the substandard layer of ores to be added to the conditioned ores. The main problem is to ensure complete extraction of useful components into concentrate from shipped ore with acceptable deviations from the required ones. A new typification of complex-structured ore blocks of the bench has been carried out. Analytical dependences of mining and geological characteristics of complex-structured ore blocks were obtained. Theoretical dependences for determining the main indicators of mineral processing are derived. Analytical dependences for determination of the content of useful component in shipped ore α' – mixture of conditioned ore with the content of useful component α and admixed layer of substandard ore with the content of useful component α'' are offered. For the first time in mining science, a new approach of complete extraction of conditioned ores from complex-structured blocks of benches by grabbing a certain part of substandard ores during excavation, increasing the volume of extracted ore and expanding the extraction of useful components in the concentrate has been substantiated. The increment of useful components can reach 10-15 % of the total volume of extraction, which allows predicting a significant increase in the completeness of mineral extraction from the Earth's interior.
-
Date submitted2021-10-15
-
Date accepted2022-09-06
-
Date published2022-11-10
Experimental research on the thermal method of drilling by melting the well in ice mass with simultaneous controlled expansion of its diameter
- Authors:
- Danil V. Serbin
- Andrey N. Dmitriev
During the seasonal work of the 64th Russian Antarctic Expedition in 2018-2019 at the “Vostok” drilling facility named after B.B.Kudryashov (“Vostok” station, Antarctic) specialists of Saint Petersburg Mining University conducted experimental investigations on the process of drilling by melting with simultaneous expansion of wells in the ice mass. A test bench and a full-scale model of a thermohydraulic reamer-drilling tool were developed, manufactured and tested for the research. The first bench tests of the full-scale model proved its efficiency and suitability for experimental drilling with simultaneous expansion of wells in ice mass; its operational capabilities were determined and the drawbacks that will be taken into account in future were found out. The article substantiates the choice of constructive elements for thermohydraulic reamer-drilling tool. It is determined that the technology of full diameter drilling with simultaneous expansion of the well in ice mass can be implemented by combining contact drilling by melting and convective expansion with creation of forced near-bottomhole annular circulation of the heated heat carrier. Dependencies of expansion rate on main technological parameters were determined: active heat power of heating elements in penetrator and circulation system, mechanical drilling rate, pump flow rate. According to the results of investigations, the experimental model of thermohydraulic reamer-drilling tool will be designed and manufactured for testing in conditions of well 5G.
-
Date submitted2014-10-20
-
Date accepted2014-12-24
-
Date published2015-08-25
Improving the technology of open-cast mining using surface miners and spreaders
- Authors:
- A. Yu. Cheban
The article is devoted to the issues of improving the efficiency of open-cast mining of solid minerals. Surface miners are effective and promising mining equipment that brought a large number of innovative technological solutions to the mining industry. The flow sheet of mining an overburden bench of high altitude with boom surface miners and the improved spreader is presented. Application of technical and technological improvements will significantly increase the productivity of mining equipment, reduce the cost of doing stripping operations and improve the profitability of the mining industry in the development of deposits of solid minerals, semi-indurated rocks.
-
Date submitted2013-07-26
-
Date accepted2013-09-18
-
Date published2014-03-17
Mining units quantity determination to achieve the established open cast output and averaging ore requirements
- Authors:
- S. I. Fomin
- V. A. Shevelev
- M. A. Marinin
The balancing stripping ratio and ore production methods include simulation in order to reduce the prestripping waste and maintain a suitable space between each bench. The reliability analysis method of mining technological system in mine design is discussed in this paper. The probabilistic approach used here takes into consideration the uncertainty associated with estimation of most economic, mining and geological variables. This paper concerns the rational distribution of reserves which can be mined and waste advancing down the open cast site at steep pitch deposit.
-
Date submitted2013-07-23
-
Date accepted2013-09-11
-
Date published2014-03-17
Use of coefficient of output at pit delimitation
- Authors:
- G. A. Kholodnyakov
- N. S. Vainonen
In work it is settled an invoice the final depth of a pit of the conditional complex occurrence presented by three minerals. It is shown that when developing complex occurrence it is more expedient to use coefficient of output, instead of overburden ratio.
-
Date submitted2013-07-23
-
Date accepted2013-09-09
-
Date published2014-03-17
Quarry capacity of ore relation from bench height
- Authors:
- G. A. Kholodnyakov
- M. D. Abdullaev
The work evaluated the impact of the bench height on the development of mining operations and quarry capacity of ore. The analysis of the height of the step depends on the area of the ore deposit within the quarry field, as well as the dependence of the length of the scope of work on the angle of the ore body.
-
Date submitted2010-07-06
-
Date accepted2010-09-25
-
Date published2011-03-21
Engineering-geological characteristics quaternary-neogene deposits coal fields Кuzbass for surface mining
- Authors:
- I. V. Kuznetsova
Opencast mining in the Kuzbass is carried out using gidromehanizatsionnyh technologies that are the most progressive and effective ways to excavate in arrays composed of Neogene-Quaternary deposits. In addition, hydromechanization a single indissoluble chain processes that integrate development, transportation and stacking of disturbed rocks in special facilities – gidrootvaly. Basic technological processes hydromechanization include: the destruction of rock massifs hydro, dredges and non-pressure streams of water pressure or free-flow hydraulic transport; gidrootvaloobrazovanie.
-
Date submitted2009-08-18
-
Date accepted2009-10-10
-
Date published2010-02-01
Increase of efficiency performance of complexes open-cut equipment
- Authors:
- A. A. Faul
At definition of benches height many features and factors are taken into consideration: conditions of burial and property of taken out rocks; necessary intensity of mining work; the planned schedule of strippings; demanded quality given out, from mineral opencast; parametres of drilling-and-blastings; working conditions of excavators and a condition of transportation of ore. The basic condition of correctly chosen bench height is its stability in the course of operation the opencast mine providing safety of conducting of mining operations.
-
Date submitted2009-07-06
-
Date accepted2009-09-24
-
Date published2010-04-22
Investigation of geomechanical processes in underground mining of mineral resources at the automated test bench for physical modeling
- Authors:
- B. Yu. Zuev
The paper presents the particular results of development of the method for modeling on equivalent materials in the recent years, concerning the evolution of the primary technical base of the laboratory – test benches, which allowed to supplement substantially the potentialities of physical modeling for its complex application jointly with the full-scale and mathematical methods in solving a number of actual tasks in mining geomechanics.