Submit an Article
Become a reviewer
Vol 207
Pages:
70
Download volume:
RUS

Mining units quantity determination to achieve the established open cast output and averaging ore requirements

Authors:
S. I. Fomin1
V. A. Shevelev2
M. A. Marinin3
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
  • 3 — National Mineral Resources University (Mining University)
Date submitted:
2013-07-26
Date accepted:
2013-09-18
Date published:
2014-03-17

Abstract

The balancing stripping ratio and ore production methods include simulation in order to reduce the prestripping waste and maintain a suitable space between each bench.  The reliability analysis method of mining technological system in mine design is discussed in this paper. The probabilistic approach used here takes into consideration the uncertainty associated with estimation of most economic, mining and geological variables. This paper concerns the rational distribution of reserves which can be mined and waste advancing down the open cast site at steep pitch deposit.

Go to volume 207

References

  1. Арсентьев А.И. Проектирование горных работ при открытой разработке месторождений / А.И.Арсентьев, Г.А.Холодняков. М.: Недра, 1994, 336 с.
  2. Arsentyev A.I. Holodnyakov G.A. Design of mining operations in the open mining. Мoscow: Nedra, 1994. 336 р.
  3. Бастан П.П. Теория и практика усреднения руд / П.П.Бастан, Е.И.Азбель, Е.М.Ключкин. М.: Недра, 1979. 256 с.
  4. Bastan P.P., Azbel Е.I., Кluchkin Е.М. Theory and practice of ore reclaiming. Moscow: Nedra, 1979. 256 p.

Similar articles

Justification of effective dust control in the open-pits of cryolithozone
2014 E. P. Dalbaeva
Methodological features of intensification natural ventilation pits
2014 V. A. Rogalev, K. N. Yastrebova
Approach to the conduct of monitoring studies in the area of the mineral and raw complex objects using remote sensing
2014 T. A. Petrova
Method of normal load prediction on vertical shaft lining based on nonlinear behaviour of rock mass
2014 A. G. Protosenya, Nguen Ny Bai
Assessment of the longwall face length influence on gas emission at longwall panels of the OJSC «Vorkutaugol» coal mines
2014 O. I. Kazanin, A. M. Sufiyarov
Influence of personal factors on neadekvatne of action of officials of mines
2014 G. V. Rudenko, I. A. Panchenko, S. V. Khokhlov, O. V. Kostromin