Submit an Article
Become a reviewer
Vol 207
Pages:
84
Download volume:

Quarry capacity of ore relation from bench height

Authors:
G. A. Kholodnyakov1
M. D. Abdullaev2
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
Date submitted:
2013-07-23
Date accepted:
2013-09-09
Date published:
2014-01-01

Abstract

The work evaluated the impact of the bench height on the development of mining operations and quarry capacity of ore. The analysis of the height of the step depends on the area of the ore deposit within the quarry field, as well as the dependence of the length of the scope of work on the angle of the ore body.

Go to volume 207

References

  1. Арсентьев А.И. Определение производительности и границ карьеров. М.: Недра, 1970. 283 с.
  2. Арсентьев А.И. Проектирование горных работ при открытой разработке месторождений / А.И.Арсентьев, Г.А.Холодняков. М.: Недра, 1994. 336 с.
  3. Трубецкой К.Н. Проектирование карьеров: В 2 т. / К.Н.Трубецкой, Г.Л.Краснянский, В.В.Хронин. М.: Изд-во Академии горных наук, 2001. Т.2. 519 с.

Similar articles

Ways of improving waste disposal in the workings of salt mines
2014 O. V. Kovalev, S. P. Mozer
Comparative analysis of methods of waste disposal biological treatment of the fuel and energy complex
2014 A. E. Isakov
Studying of the overgrowth mechanism dumps overburden breeds in climatic conditions of northern regions
2014 V. S. Kuznetsov
Research of technogenic migration of manganese in water objects of the Kovdor area
2014 V. A. Petrova, M. A. Pashkevich
Physical processes methane formation as a result of coal disintegration
2014 M. G. Menzhulin, A. V. Montikov, S. V. Vasilev
Prospects of improving technology for development of coalseams in Vietnam’s undergroundmines
2014 Kao Kuok Vet, V. P. Zubov