Quarry capacity of ore relation from bench height
About authors
- 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
- 2 — post-graduate student National Mineral Resources University (Mining University)
Abstract
The work evaluated the impact of the bench height on the development of mining operations and quarry capacity of ore. The analysis of the height of the step depends on the area of the ore deposit within the quarry field, as well as the dependence of the length of the scope of work on the angle of the ore body.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
Funding:
None
References
- Arsentyev A.I. Determination of productivity andborders of pits. Мoscow: Nedra, 1970. 283 p.
- Arsentyev A.I. Holodnyakov G.A. Design of miningoperations in the open mining. Мoscow: Nedra, 1994. 336 р.
- Troubetzkoy K.N., Krasnyansky G.L., Hronin V.V.Design quarry: 2 vols. Мoscow: Publ. house of the Academy of Mining Sciences, 2001. Vol.2. 519 p.
Similar articles
Prospects of improving technology for development of coalseams in Vietnam’s undergroundmines
2014 Kao Kuok Vet, V. P. Zubov
Assessment of the longwall face length influence on gas emission at longwall panels of the OJSC «Vorkutaugol» coal mines
2014 O. I. Kazanin, A. M. Sufiyarov
Comparative analysis of methods of waste disposal biological treatment of the fuel and energy complex
2014 A. E. Isakov