Quarry capacity of ore relation from bench height
About authors
- 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
- 2 — post-graduate student National Mineral Resources University (Mining University)
Abstract
The work evaluated the impact of the bench height on the development of mining operations and quarry capacity of ore. The analysis of the height of the step depends on the area of the ore deposit within the quarry field, as well as the dependence of the length of the scope of work on the angle of the ore body.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
Funding:
None
References
- Arsentyev A.I. Determination of productivity andborders of pits. Мoscow: Nedra, 1970. 283 p.
- Arsentyev A.I. Holodnyakov G.A. Design of miningoperations in the open mining. Мoscow: Nedra, 1994. 336 р.
- Troubetzkoy K.N., Krasnyansky G.L., Hronin V.V.Design quarry: 2 vols. Мoscow: Publ. house of the Academy of Mining Sciences, 2001. Vol.2. 519 p.
Similar articles
About the long-range programme for industrial and ecological safety in coal branch of industry
2014 V. V. Smirnyakova
Experience of implementing electromagnetic shielding on OJSC «Mordovcement»
2014 P. S. Sedov, S. V. Kovshov, Z. N. Cherkai
Assessment of the longwall face length influence on gas emission at longwall panels of the OJSC «Vorkutaugol» coal mines
2014 O. I. Kazanin, A. M. Sufiyarov