Quarry capacity of ore relation from bench height

Authors:
G. A. Kholodnyakov1
M. D. Abdullaev2
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
Date submitted:
2013-07-23
Date accepted:
2013-09-09
Date published:
2014-03-17

Abstract

The work evaluated the impact of the bench height on the development of mining operations and quarry capacity of ore. The analysis of the height of the step depends on the area of the ore deposit within the quarry field, as well as the dependence of the length of the scope of work on the angle of the ore body.

Go to volume 207

References

  1. Арсентьев А.И. Определение производительности и границ карьеров. М.: Недра, 1970. 283 с.
  2. Арсентьев А.И. Проектирование горных работ при открытой разработке месторождений / А.И.Арсентьев, Г.А.Холодняков. М.: Недра, 1994. 336 с.
  3. Трубецкой К.Н. Проектирование карьеров: В 2 т. / К.Н.Трубецкой, Г.Л.Краснянский, В.В.Хронин. М.: Изд-во Академии горных наук, 2001. Т.2. 519 с.

Similar articles

Identification of degradation of soil and vegetable communities testing technogenic loading on materials of space shooting
2014 D. S. Korelskii
Use of coefficient of output at pit delimitation
2014 G. A. Kholodnyakov, N. S. Vainonen
Increase of stability of mine workings in the permafrost zone
2014 A. F. Galkin
Technology options for the preparation of new horizons
2014 G. A. Kholodnyakov, D. N. Ligotskii
Status and development of mining and enrichment of rare earth metals in Russia
2014 M. N. Andreev
Ways of improving waste disposal in the workings of salt mines
2014 O. V. Kovalev, S. P. Mozer