Quarry capacity of ore relation from bench height

Authors:
G. A. Kholodnyakov1
M. D. Abdullaev2
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
Date submitted:
2013-07-23
Date accepted:
2013-09-09
Date published:
2014-01-01

Abstract

The work evaluated the impact of the bench height on the development of mining operations and quarry capacity of ore. The analysis of the height of the step depends on the area of the ore deposit within the quarry field, as well as the dependence of the length of the scope of work on the angle of the ore body.

Go to volume 207

References

  1. Арсентьев А.И. Определение производительности и границ карьеров. М.: Недра, 1970. 283 с.
  2. Арсентьев А.И. Проектирование горных работ при открытой разработке месторождений / А.И.Арсентьев, Г.А.Холодняков. М.: Недра, 1994. 336 с.
  3. Трубецкой К.Н. Проектирование карьеров: В 2 т. / К.Н.Трубецкой, Г.Л.Краснянский, В.В.Хронин. М.: Изд-во Академии горных наук, 2001. Т.2. 519 с.

Similar articles

Experimental researches on definition energy costs of workers, depending on the parameters of the cooling microclimate
2014 A. F. Galkin, R. G. Khusainova
Contemporary Problems of salvaging drill cuttings on the Western Siberia oilfields of the final stage of development
2014 V. V. Katsilo
Optimization of work of dust supperession sprayer with use of computing modelling
2014 Yu. D. Smirnov, O. S. Dobrynin
Increase of stability of mine workings in the permafrost zone
2014 A. F. Galkin
Physical modeling of interchamber pillars fixity in Gubkin mine
2014 E. I. Boguslavskii, B. Yu. Zuev, P. V. Korzhavykh
Primary forecast of density-related nonstationarity of cross-section upper part
2014 I. B. Movchan, V. Yu. Asyanina