Quarry capacity of ore relation from bench height

Authors:
G. A. Kholodnyakov1
M. D. Abdullaev2
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — post-graduate student National Mineral Resources University (Mining University)
Date submitted:
2013-07-23
Date accepted:
2013-09-09
Date published:
2014-03-17

Abstract

The work evaluated the impact of the bench height on the development of mining operations and quarry capacity of ore. The analysis of the height of the step depends on the area of the ore deposit within the quarry field, as well as the dependence of the length of the scope of work on the angle of the ore body.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
quarry capacity bench height the ore sinking rate
Go to volume 207

References

  1. Arsentyev A.I. Determination of productivity andborders of pits. Мoscow: Nedra, 1970. 283 p.
  2. Arsentyev A.I. Holodnyakov G.A. Design of miningoperations in the open mining. Мoscow: Nedra, 1994. 336 р.
  3. Troubetzkoy K.N., Krasnyansky G.L., Hronin V.V.Design quarry: 2 vols. Мoscow: Publ. house of the Academy of Mining Sciences, 2001. Vol.2. 519 p.

Similar articles

Experimental researches on definition energy costs of workers, depending on the parameters of the cooling microclimate
2014 A. F. Galkin, R. G. Khusainova
The analysis of the stress-and-strain state in vicinity of mining excavations
2014 A. A. Sankovskii, E. R. Kovalsky
Quality management of brown coal at open-pit mine in the presence of several consumers with varios requirements to it
2014 M. M. Yakubovskii, K. Drebenshtedt
Production of slate gas
2014 R. D. Magomet
Occupational safety and health professional
2014 Z. N. Cherkai
Stopes walls stabilization at the rich iron ore mining by the flat-back cut-and-fill method
2014 V. P. Zubov, M. D. Morozov, A. S. Malyutin