Complete extraction of conditioned ores from complex-structured blocks due to partial admixture of substandard ores

Article preview

The paper presents mining-technological substantiation of complete extraction of conditioned ores from complex-structured blocks of benches by mixing a layer of substandard ores of certain sizes. The relevance of the work consists in the development of innovative methods of establishing the parameters of the substandard layer of ores to be added to the conditioned ores. The main problem is to ensure complete extraction of useful components into concentrate from shipped ore with acceptable deviations from the required ones. A new typification of complex-structured ore blocks of the bench has been carried out. Analytical dependences of mining and geological characteristics of complex-structured ore blocks were obtained. Theoretical dependences for determining the main indicators of mineral processing are derived. Analytical dependences for determination of the content of useful component in shipped ore α' – mixture of conditioned ore with the content of useful component α and admixed layer of substandard ore with the content of useful component α'' are offered. For the first time in mining science, a new approach of complete extraction of conditioned ores from complex-structured blocks of benches by grabbing a certain part of substandard ores during excavation, increasing the volume of extracted ore and expanding the extraction of useful components in the concentrate has been substantiated. The increment of useful components can reach 10-15 % of the total volume of extraction, which allows predicting a significant increase in the completeness of mineral extraction from the Earth's interior.

How to cite: Rakishev B.R. Complete extraction of conditioned ores from complex-structured blocks due to partial admixture of substandard ores // Journal of Mining Institute. 2024. Vol. 270 . p. 919-930. EDN HNCZSX
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2021-03-23
  • Date accepted
    2022-01-24
  • Date published
    2022-04-29

Justification of the technological scheme parameters for the development of flooded deposits of construction sand

Article preview

The article describes the main types of technological schemes for working out the flooded strata of sand deposits using hydraulic shovel excavators. The analysis of scientific and technical literature describing the experience of using hydraulic shovel excavators in the open-pit mining, including pits for the extraction of construction sand, has been carried out. The proposed technological scheme is that the development of reserves of the flooded strata without preliminary water reduction is carried out by a hydraulic shovel excavator from under water by a downward digging with the storage of the extracted rock mass in bulk (for dewatering), placed in such a way that when working out the next mining bench width, it is located within the working area of the excavator for simultaneous processing of the next bench width and loading of dewatered sand from the pile. Calculations of the parameters of the operating platform and the excavator block of the proposed technological scheme for conducting open-pit mining were carried out. The dependence for determining the minimum length of the mining operations front of an excavator for drawing up a technological scheme of operation of a backhoe hydraulic excavator on working out the flooded strata with the pile formation for dewatering sand and its subsequent uploading from the pile by the same excavator is presented.

How to cite: Ivanov V.V., Dzyurich D.O. Justification of the technological scheme parameters for the development of flooded deposits of construction sand // Journal of Mining Institute. 2022. Vol. 253 . p. 33-40. DOI: 10.31897/PMI.2022.3
Mining
  • Date submitted
    2014-10-20
  • Date accepted
    2014-12-24
  • Date published
    2015-08-25

Improving the technology of open-cast mining using surface miners and spreaders

Article preview

The article is devoted to the issues of improving the efficiency of open-cast mining of solid minerals. Surface miners are effective and promising mining equipment that brought a large number of innovative technological solutions to the mining industry. The flow sheet of mining an overburden bench of high altitude with boom surface miners and the improved spreader is presented. Application of technical and technological improvements will significantly increase the productivity of mining equipment, reduce the cost of doing stripping operations and improve the profitability of the mining industry in the development of deposits of solid minerals, semi-indurated rocks.

How to cite: Cheban A.Y. Improving the technology of open-cast mining using surface miners and spreaders // Journal of Mining Institute. 2015. Vol. 214 . p. 23-27.
Geotechnology for development of solid mining fields
  • Date submitted
    2013-07-26
  • Date accepted
    2013-09-18
  • Date published
    2014-03-17

Mining units quantity determination to achieve the established open cast output and averaging ore requirements

Article preview

The balancing stripping ratio and ore production methods include simulation in order to reduce the prestripping waste and maintain a suitable space between each bench. The reliability analysis method of mining technological system in mine design is discussed in this paper. The probabilistic approach used here takes into consideration the uncertainty associated with estimation of most economic, mining and geological variables. This paper concerns the rational distribution of reserves which can be mined and waste advancing down the open cast site at steep pitch deposit.

How to cite: Fomin S.I., Shevelev V.A., Marinin M.A. Mining units quantity determination to achieve the established open cast output and averaging ore requirements // Journal of Mining Institute. 2014. Vol. 207 . p. 70-73.
Geotechnology for development of solid mining fields
  • Date submitted
    2013-07-23
  • Date accepted
    2013-09-09
  • Date published
    2014-03-17

Quarry capacity of ore relation from bench height

Article preview

The work evaluated the impact of the bench height on the development of mining operations and quarry capacity of ore. The analysis of the height of the step depends on the area of the ore deposit within the quarry field, as well as the dependence of the length of the scope of work on the angle of the ore body.

How to cite: Kholodnyakov G.A., Abdullaev M.D. Quarry capacity of ore relation from bench height // Journal of Mining Institute. 2014. Vol. 207 . p. 84-86.
Mining
  • Date submitted
    2009-08-18
  • Date accepted
    2009-10-10
  • Date published
    2010-02-01

Increase of efficiency performance of complexes open-cut equipment

Article preview

At definition of benches height many features and factors are taken into consideration: conditions of burial and property of taken out rocks; necessary intensity of mining work; the planned schedule of strippings; demanded quality given out, from mineral opencast; parametres of drilling-and-blastings; working conditions of excavators and a condition of transportation of ore. The basic condition of correctly chosen bench height is its stability in the course of operation the opencast mine providing safety of conducting of mining operations.

How to cite: Faul A.A. Increase of efficiency performance of complexes open-cut equipment // Journal of Mining Institute. 2010. Vol. 186 . p. 86-89.