Methodology for determining maximum permissible deviations of geological exploration drilling rates
Abstract
Preparation of design and estimate documentation since January 1, 1994 is made according to the Collections of norms of basic costs (CNBC) for geological and exploration works.
Область исследования:
(Archived) Without section
References
- Golovkin A.V. Calculation of aggregated complex rates by the method of typical representative On the example of mechanical core drilling // Collection of works / VITR. 1980. № 134.
- Collection of norms of basic costs (CNBC), Iss. 5. Exploration drilling / VIEMS. М., 1993.
- Sosinsky L.M. About one algorithm of the operational plan compilation // Computers in the control systems of mining enterprises: Materials of the seminar / Edited by A.D. Shkolnikov; Leningrad Mining Institute. L. 1971.
Similar articles
Modeling the need for enterprise resources in market conditions
1995 L. I. Iseeva, V. Yu. Russkikh, L. M. Sosinsky, L. G. Turovskaya, O. V. Russkikh
Experience of capital investment planning in the conditions of transition to new economic relations on the example of urban economy of St.Petersburg
1995 A. V. Krylov, M. I. Pirogov
Methodological approach to the formation of the concept of oil and gas resource development
1995 A. A. Ilyinsky