Influence of thickness of Proterozoic clays in the tunnel roof on shifts of clay-sediment contact

Authors:
E. E. Martirosyants
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2001-07-06
Date accepted:
2001-08-12
Date published:
2002-05-20

Abstract

The study of the stress-strain state of the rock massif during the driving tunnels in the layered environment is a rather complicated geomechanical problem. The paper reflects the results of the investigation of the planar (two-dimensional) stress-strain state of the rock massif around the St. Petersburg Metro tunnel by the finite element method. The data of tests of physical and mechanical properties of Proterozoic clays carried out in different years by different organizations are summarized. The calculation scheme representing a two-layer plate of 80 x 80 m with a 6-m diameter tunnel excavated at the depth of 60 m from the surface in Proterozoic clays covered with the thickness of the Quaternary deposits of variable thickness is presented. The causes and mechanism of deformation of the rock strata, subsidence of the contact of Quaternary sediments with sediments and, as a consequence, the day surface are revealed. Results of calculations, values of tunnel contour subsidence, subsidence of clay-sediment contact at 5 and 20 m ceiling, subsidence of day surface, confirmed the assumption made earlier that the deformation of the covering strata is significantly affected by the thickness of clay in the tunnel roof.

Область исследования:
(Archived) Development of underground space
Go to volume 150

Similar articles

Particularities of information support for marketing activities of mining enterprises
2002 E. M. Ryzhikh
To the geochemistry of bottom sediments of Lake Pyasino (Norilsk District)
2002 E. M. Starichkov
The main directions of investment activities of the mining enterprise in the natural and industrial complex
2002 Yu. V. Lyubek
The method of re-conservation of temporarily non-working pit wall in two stages with the formation of a bulk prism
2002 T. N. Donchenko
Current state of the mineral resource base of the mining industry in central China
2002 Li Li
Fuzzy logic in horizontal converter gas control
2002 A. S. Anashkin