Submit an Article
Become a reviewer
Vol 150 Iss. 2
Pages:
49-53
Download volume:
RUS
Article

Rationale for open-pit mining of non-industrial bauxite deposits in the Northern Urals

Authors:
N. V. Radko
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2001-07-25
Date accepted:
2001-08-28
Date published:
2002-05-20

Abstract

At the moment, the extraction of bauxite in Russia is carried out by four enterprises: OJSC SUBR (3,136.4 thousand tons), OJSC UUBR (186 thousand tons), OJSC Boksitogorsk Alumina (200 thousand tons), and OJSC Severo-Onezhsky Bauxite Mine (303.8 thousand tons). Ural aluminium smelters are supplied with 80-90% of their raw materials from the Severouralskoye deposit. The Kandalaksha, Krasnoyarsk, and partially Irkutsk and Novokuznetsk aluminum smelters depend on the state of the raw material base of SUBR. The main type of bauxite extraction at SUBR is underground mining (about 95% of bauxite extracted). The remaining 5% is extracted by open pit mining. The volumes of open-pit bauxite mined are quite insignificant compared to the bauxite mined from the mines. There are a number of reasons why open-pit mining is becoming increasingly important at SUBR. At SUBR, all of the surrounding areas are being actively explored for possible open pit mining of small bauxite deposits. However, insignificant bauxite deposits are excluded from the range of deposits potentially suitable for development due to the fact that the evaluation of the bauxite-bearing areas is carried out without taking into account the complexity of deposits, the characteristic feature of which in this region is the joint occurrence of coal and bauxite on a limestone basement. Moreover, there are a number of coal mines, due to the industry focus of which under the mined coal seams remain untouched deposits of bauxite.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 150

Similar articles

Fundamentals of intelligent data analysis application in electricity supply management tasks of an enterprise
2002 V. A. Khachaturyan
The method of re-conservation of temporarily non-working pit wall in two stages with the formation of a bulk prism
2002 T. N. Donchenko
Analysis of experience in organizing labor remuneration in countries with developed market economies
2002 A. V. Markov
Particularities of information support for marketing activities of mining enterprises
2002 E. M. Ryzhikh
Comparative assessment of iodine determination techniques in natural waters
2002 A. A. Evstratova
Fuzzy logic in horizontal converter gas control
2002 A. S. Anashkin