Possibilities of computer modeling of mining works

Authors:
S. Pessler1
K. Drebenshtedt2
About authors
  • 1 — Freiberg Mining Academy (Technical University)
  • 2 — Freiberg Mining Academy (Technical University)
Date submitted:
2007-07-29
Date accepted:
2007-09-25
Date published:
2008-01-01

Abstract

One of the key elements enhancing performance and efficiency characteristics of excavating machines as well as reducing costs is a high degree of automation and introduction of computerized systems to collect, analyze data and plan technological parameters of mining. The article reveals possibilities to optimize mining planning and production with application of computer simulation.

Go to volume 174

References

  1. Drebenstedt C., Jung B., Löber P. Modulares Gesamtkonzept zur dynamischen Betriebsplanung und –führung, Kolloquium für Innovation im Braunkohlenbergbau, 8/9.11.2006, Magdeburg, DEBRIV e.V.
  2. Drebenstedt C., Päßler S. Leistungsvorausberechnung für den Vorschnittbetrieb des Tagebaus Nochten 2006; Forschungsbericht; Institut für Bergbau und Spezialtiefbau, TU Bergakademie Freiberg, 2005 (unveröffentlicht).
  3. Potzeldt H. VR im Bergbau, insbesondere bei der Planung im Tagebau, Literaturarbeit, Institut für Bergbau und Spezialtiefbau, TU Bergakademie Freiberg, 2006.
  4. Drebenstedt C., Päßler S. Output calculation model of bucket wheel excavators supported by Virtual Reality, proceedings MPES 2006, Turino, Italy, 2006

Similar articles

Justification of steam-thermal horizontal well location in bitumen reservoir on the basis of complex generalization of geological-geophysical, field and laboratory data on the example of Mordovo-Karmalskoye field
2008 D. A. Dautov
Prevention of corrosion and salt deposition by inhibiting foam systems in wells of North-West Bashkortostan fields
2008 B. R. Gilmutdinov
Investigation of the possibilities of water-gas influence on the reservoir using pump-ejector units
2008 D. I. Popov
Determination of accuracy of a combined system of tachymeter and echo-sounder and suggestions of improvement
2008 Britta Lickfett, Friedrich Partmann
Features of engineering-geological surveys in areas of eluvial soil development (on the example of Nizhnekamsk)
2008 I. I. Nugmanov
Technological solutions and substantiation of geomechanical parameters of open-underground method of coal deposits development
2008 V. V. Senkus