Submit an Article
Become a reviewer
Vol 174
Pages:
86-89
Download volume:
RUS

Technological solutions and substantiation of geomechanical parameters of open-underground method of coal deposits development

Authors:
V. V. Senkus
About authors
  • Siberian State Industrial University
Date submitted:
2007-07-29
Date accepted:
2007-09-10
Date published:
2008-03-17

Abstract

The paper publishes the design results of two variants of combined underground and surface coal mining, as well as the program and methodology of geomechanical support of combined coal mining.

Сенкус В.В. Технологические решения и обоснование геомеханических параметров открыто-подземного способа разработки угольных месторождений // Записки Горного института. 2008. Т. 174 . С. 86-89.
Senkus V.V. Technological solutions and substantiation of geomechanical parameters of open-underground method of coal deposits development // Journal of Mining Institute. 2008. Vol. 174 . p. 86-89.
Go to volume 174

Similar articles

Justification of steam-thermal horizontal well location in bitumen reservoir on the basis of complex generalization of geological-geophysical, field and laboratory data on the example of Mordovo-Karmalskoye field
2008 D. A. Dautov
Some topics on using ultrasonic method for concrete casting level measurement in bored pile foundation
2008 Lan Kai, Yan Taining, Shao Chun
Development of device structure for detection of metal objects in ore
2008 A. M. Kurchukov
Management of underground issues in France using probabilistic methods
2008 Maxime Cauvin
Research of dependence of viscosity of electrolyte viscosity of electrolyte of copper refining production on its composition and temperature
2008 I. S. Kuzmina
Integrated monitoring of the impact of Severonickel Combine on the natural environment
2008 M. V. Parshina, D. S. Korelskii