Development of technology for construction of sidetracks with horizontal sections under the condition of preservation of the old wellbore and existing production from it. Justification of economic feasibility of drilling of sidetracks with horizontal sect

Authors:
S. V. Gavrilov
About authors
  • Samara State Technical University
Date submitted:
2007-07-15
Date accepted:
2007-09-13
Date published:
2008-03-17

Abstract

The practice of new oil and gas field development often shows that the real oildrainage boundary is larger than supposed one. On account of this the special zones are fixed in the area of oil field that are not in the area of drainage usually. The similar situation is considered by the example of oil field in Western Siberia. It was suggested to develop the area of field that was not covered with well spacing by means of construction of two lateral branches with horizontal sections instead of four deviated wells to solve this problem. The drilling technology of lateral branches and technology of tailing-in are considered by stages. A review of equipment that is used in drilling of lateral branches and in completion of wells with branch holes is given. The economical expediency of project realization of lateral branches construction.

Go to volume 174

Similar articles

Solution of problems of water flooding of high-viscosity oil deposits in carbonate reservoirs
2008 V. V. Mukhametshin
Development and application of 3D-model of the territory for making optimal management decisions
2008 I. V. Ilinykh
Economic evaluation of labor potential use efficiency in coal-mining region
2008 I. A. Getmanova
PB- and SR-isotopes – indicators for mixing processes in mine waters of the «Himmelfahrt Fundgrube»
2008 Heidel Claudia
Assessment of financial stability of LLC Peterburgteploenergo
2008 I. I. Kashtanova
Hydromechanical power plant of a quarry drilling machine
2008 S. A. Semova