Submit an Article
Become a reviewer
Vol 174
Pages:
93-97
Download volume:
RUS
Article

Analytical method of determining the overburden exploitation factor by means of the graph of its minimum current volumes

Authors:
M. P. Bukasa
About authors
  • G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2007-07-11
Date accepted:
2007-09-20
Date published:
2008-03-17

Abstract

The work is devoted to the analytical method of solving the problem of stabilization of quarry productivity. The dependence of the average operating stripping ratio on the duration of the operational period of the open pit activity is established. Practical calculations are presented for one of the diamond kimberlite pipes of the Democratic Republic of Congo and were performed on the basis of AutoCAD 2006 and Microsoft Excel.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Go to volume 174

Similar articles

Monitoring and development of methods of oil sludge pits reclamation
2008 M. M. Malyshkin, M. A. Pashkevich
Petrological characterization of montsogranites and granosigenites of the Ubukunskoye ore occurrence
2008 N. A. Grebenkin, V. V. Suchkov
Waterproofing compound for limiting water inflow into producing oil wells
2008 I. N. Diyarov, N. Yu. Bashkirtseva, R. R. Agliullin
Assessment of financial stability of LLC Peterburgteploenergo
2008 I. I. Kashtanova
Features of engineering-geological surveys in areas of eluvial soil development (on the example of Nizhnekamsk)
2008 I. I. Nugmanov
Modeling the solution gas drive process in heavy oils
2008 Mehdi Chraïbi, Stéphane Zaleski, Fabienne Franco