Analytical method of determining the overburden exploitation factor by means of the graph of its minimum current volumes

Authors:
M. P. Bukasa
About authors
  • G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2007-07-11
Date accepted:
2007-09-20
Date published:
2008-03-17

Abstract

The work is devoted to the analytical method of solving the problem of stabilization of quarry productivity. The dependence of the average operating stripping ratio on the duration of the operational period of the open pit activity is established. Practical calculations are presented for one of the diamond kimberlite pipes of the Democratic Republic of Congo and were performed on the basis of AutoCAD 2006 and Microsoft Excel.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Funding:

None

Go to volume 174

Similar articles

Investigation of the possibilities of water-gas influence on the reservoir using pump-ejector units
2008 D. I. Popov
Hydrogeochemical conditions of the eastern slope of the Polar Urals
2008 N. V. Guseva
Features of engineering-geological surveys in areas of eluvial soil development (on the example of Nizhnekamsk)
2008 I. I. Nugmanov
Hydromechanical power plant of a quarry drilling machine
2008 S. A. Semova
Assessment and reduction of technogenic load in the zone of influence of oilfields of LLC RN-YUGANSKNEFTEGAZ
2008 M. V. Kozhevnikova
Removing cuttings from deviated and horizontal wells
2008 Sandoiu Gheorghe-Florin