Analytical method of determining the overburden exploitation factor by means of the graph of its minimum current volumes

Authors:
M. P. Bukasa
About authors
  • G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2007-07-11
Date accepted:
2007-09-20
Date published:
2008-03-17

Abstract

The work is devoted to the analytical method of solving the problem of stabilization of quarry productivity. The dependence of the average operating stripping ratio on the duration of the operational period of the open pit activity is established. Practical calculations are presented for one of the diamond kimberlite pipes of the Democratic Republic of Congo and were performed on the basis of AutoCAD 2006 and Microsoft Excel.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Funding:

None

Go to volume 174

Similar articles

Economic added value as a tool of company management
2008 S. G. Galevskii
Justification of steam-thermal horizontal well location in bitumen reservoir on the basis of complex generalization of geological-geophysical, field and laboratory data on the example of Mordovo-Karmalskoye field
2008 D. A. Dautov
Hydrified tunneling complex for hard rocks
2008 M. V. Kucherenko, A. A. Kucherenko
Some topics on using ultrasonic method for concrete casting level measurement in bored pile foundation
2008 Lan Kai, Yan Taining, Shao Chun
Assessment of financial stability of LLC Peterburgteploenergo
2008 I. I. Kashtanova
Hydrogeochemical conditions of the eastern slope of the Polar Urals
2008 N. V. Guseva