Analytical method of determining the overburden exploitation factor by means of the graph of its minimum current volumes
Authors:
About authors
- G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
The work is devoted to the analytical method of solving the problem of stabilization of quarry productivity. The dependence of the average operating stripping ratio on the duration of the operational period of the open pit activity is established. Practical calculations are presented for one of the diamond kimberlite pipes of the Democratic Republic of Congo and were performed on the basis of AutoCAD 2006 and Microsoft Excel.
Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Similar articles
Justification of steam-thermal horizontal well location in bitumen reservoir on the basis of complex generalization of geological-geophysical, field and laboratory data on the example of Mordovo-Karmalskoye field
2008 D. A. Dautov
Technology of fabrication in relation to microstructure of Ni-Ti shape memory alloys
2008 I. Szurman, M. Kursa