Submit an Article
Become a reviewer
S. V. Gavrilov
S. V. Gavrilov
Samara State Technical University
Samara State Technical University

Articles

Topical issues in prospecting and development of oil and gas deposits
  • Date submitted
    2007-07-15
  • Date accepted
    2007-09-13
  • Date published
    2008-01-01

Development of technology for construction of sidetracks with horizontal sections under the condition of preservation of the old wellbore and existing production from it. Justification of economic feasibility of drilling of sidetracks with horizontal sect

Article preview

The practice of new oil and gas fields development often shows that the real oil-drainage boundary is larger than the assumed one. In this connection special zones are fixed on the territory of oil field, which usually are not included into the drainage zone. Such situation is considered on the example of an oil field in Western Siberia. To solve this problem, it was proposed to develop the area of the field not covered by wells by constructing two lateral branches with horizontal sections instead of four inclined wells. The technology of drilling the lateral branches and the technology of tailings cutting are discussed step by step. A review of the equipment used in drilling lateral branches and completing branch wells is given. The economic feasibility of the lateral branch construction project is considered.

How to cite: Gavrilov S.V. Development of technology for construction of sidetracks with horizontal sections under the condition of preservation of the old wellbore and existing production from it. Justification of economic feasibility of drilling of sidetracks with horizontal sect // Journal of Mining Institute. 2008. Vol. 174. p. 60-62.