To the question of increase of stability of quarry sides at contour explosion due to application of gel-like explosives
About authors
- 1 — G.V. Plekhanov Saint Petersburg State Mining Institute
- 2 — G.V. Plekhanov Saint Petersburg State Mining Institute
Abstract
In exploitation of deep open-pit one of the main problems is increasing stability pit wall during making it in final position. As is generally known, to provide over contour massive in safety is used one of widespread blasting method – the pre-split blasting. In given work is proposed to use gel explosive Gelpor GP-2У to make a quality reflection crack for Kostomuksha ore open pit geological structure. Were made a calculation of basic parameters in pre-blasting method with using gel explosive Gelpor GP-2У and given estimation of calculation result with experimental data, using on Kostomuksha ore open pi in pre-split blasting.
Область исследования:
(Archived) Blasting, explosives and means of mechanization of their application
Similar articles
Methodology for determination of ideal detonation parameters of emulsion idealization capability
2009 N. G. Demchenko
Experience of using emulsion compositions and optimization of BVR parameters during stripping of overburden and kimberlites at the quarry of the Yubileynaya pipe of Aikhal Mining and Processing Division
2009 V. F. Kostyrin
Increase of efficiency and safety of mining works at management of mountain pressure by filling of the excavated space
2009 S. A. Tolstunov
Influence of processes of hypergenic metamorphization of technogenic massifs on the degree of their environmental danger for the environment
2009 M. V. Parshina