Submit an Article
Become a reviewer
Vol 180
Pages:
181-185
Download volume:
RUS
Article

Selection of stripping parameters at use of environmental geotechnologies of steeply falling veins development

Authors:
G. V. Sabyanin
About authors
  • Institute for Problems of Integrated Subsoil Development, RAS
Date submitted:
2008-07-10
Date accepted:
2008-09-16
Date published:
2009-02-18

Abstract

In work the theoretical decision of a problem on completeness of dredging of curvilinear two-dimensional ore bodies is given by rectilinear explosive chinks and the design procedure of depth of chinks on conditions of a minimum of losses of not beaten off ore is offered.

Область исследования:
(Archived) Blasting, explosives and means of mechanization of their application
Funding:

None

Go to volume 180

Similar articles

Algorithm of calculation of a crack in a rock at application of a borehole extended shaped charge
2009 A. P. Gospodarikov, V. N. Kovalevskiy
Development of a new manufacturing technology for powdered EVB
2009 Wan Syui-Guan, Li Chzhigo, Kan' Tinchzhan, Chzhan' Syaochzhi, Li Zydyan
Distributed systems of regulation of thermal regime of mines and ore-makers of the North
2009 A. F. Galkin
Low-waste and environmental technology of mining of minerals at quarries with the help of hydraulic hammers
2009 G. A. Kholodnyakov, D. N. Ligotskiy, A. V. Polovinko
Method of structural-geological forecast at processing of space images in the task of optimization of search for mineral deposits
2009 I. B. Movchan, A. A. Yakovleva
Explosive detonation of a cut block by beam and vertical concentrated explosive charges in a massif with tectonic stress fields
2009 A. A. Eremenko, V. M. Seryakov, V. A. Eremenko, S. V. Fefelov, D. N. Zinchenko