Mining

The integrated reloading point at the combined auto-railway transportation

Authors:
M. M. Yakubovskii1
G. A. Kholodniakov2
About authors
  • 1 — Postgraduate student Saint Petersburg State Mining Institute (Technical University)
  • 2 — Ph.D., Dr.Sci. Professor Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-08-28
Date accepted:
2009-10-04
Date published:
2010-02-01

Abstract

In article it is considered the technology of creation and exploitation of reloading ore warehouse. As the reloading equipment it is offered to use a hydraulic backhoe excavator. At the combined transport the warehouse is an irreplaceable link in a technological chain. Basic difference from existing schemes of warehousing is that ore is housed not in a stack but in a concentration trench. The concentration trench is formed in immediate proximity from a face. It allows to prolong the operation term of the warehouse and to exclude rigid interdependence of the combined transport links.

Keywords:
combined transport reloading store receiving trench
Go to volume 186

References

  1. Кортелев О.Б. Перспективы комбинированного транспорта на угольных карьерах / О.Б.Кортелев, С.Г.Молотилов, В.К.Норри // Горный информационно-аналитический бюллетень. М.: Изд-во МГГУ, 2005. № 1. C.55-57.
  2. Молотилов С.Г. Интенсификация погрузочно-транспортных работ на карьерах / С.Г.Молотилов, Е.И.Васильев, О.Б.Кортелев. Новосибирск: Изд-во СО РАН, 2000. 208 c.
  3. Перелыгин В. Ближайшие перспективы карьерного транспорта [Электронный ресурс] // Основные средства. 2008 № 5. URL 2009_03_17-15_15_41/

Similar articles

The autoresonant electric drive of the swinging movement pendular vibration exciter vibration jaw crushers
2010 Yu. A. Gavrilov, E. A. Zagrivnyi
Perfection of shutters for ore chutes
2010 Yu. D. Tarasov, I. V. Ushatinsky
Calculation of material streams of the pirometallurgical cycle of processing of copper sulphidic raw materials
2010 N. V. Danilova
Selection of optimal scheme of a reclamation of mining damp of the open-cast «Mejdyrechensky»
2010 I. R. Levchuk
The influence of change in geotechnical engineering and geoenvironmental conditions during the process of building and operation of constructions of projected Alekseevsky cement factory on their stability (Mordovia Republic)
2010 K. V. Pankratova
Analysis and synthesis of commercial oil using radioisotope measuring the density
2010 I. N. Voityuk