Submit an Article
Become a reviewer
Vol 194
Pages:
132-137
Download volume:
RUS
Article

Ultra wide band gpr-method: success and problems

Authors:
V. B. Boltintsev1
V. N. Ilyakhin2
K. P. Bezrodnyi3
About authors
  • 1 — Ph.D. assistant general manager BJSC SPF «Geodizond»
  • 2 — chief engineer BJSC SPF «Geodizond»
  • 3 — Ph.D., Dr.Sci. assistant general manager JSC NIPII «Lenmetrogiprotrans»
Date submitted:
2010-12-16
Date accepted:
2011-02-22
Date published:
2011-12-30

Abstract

An advanced method of ultra-wide band electromagnetic ground penetrating probing has been developed. This method enables the running of geological probing measurements from both the surface of the land and the boring face during construction of tunnels up to a depth of one hundred meters, and in special cases, even deeper. Portable equipment of low weight is used for these underground radar measurements. Total weight is not more 15 kg. Time of geological cut measurement and its data processing is approximately 3 hours for probing depths of about 70 m.

Область исследования:
(Archived) Application of the modern geophysical technologies for prospecting and exploration of mineral deposits
Keywords:
Ultra Wide band – UWB Drift Step Recovery Diodes equation of Wiener – Hope GPR-method
Funding:

None

Go to volume 194

References

  1. Grehov I.V., Efanov V.M., Kardo-Sysoev A.F., Shenderey S.V. Powerful the semi-conductor generator nanoseconds impulses // Devices and technics of experiment. 1986. N 1. P.93-94.
  2. Boltintsev V.B., Iljahin V.N., Cheremisin A.A., Bezrodniy K.P., Nagorniy S.J. Application of a method of electromagnetic pulse superbroadband sounding at engineeringgeological researches // Engineering geology. 2006. N 2. P.72-76.
  3. The certificate on useful model 28289. The Russian Federation 7 H 01 Q 7/00. The aerial for underground sounding / V.B.Boltintsev; the applicant and the owner of the patent Joint-Stock Company NPF eodizond. 2002126446/20; it is declared 07.10.02; publ. 10.03.03. Bul. N 7.

Similar articles

Reactive power compensation optimization and its optimization in the electrical network complex
2011 Ya. E. Shklyarskii, I. Gonsales Palau
Regularities of formation and distribution оf the zonal groundwater of the Eastern caucasus (on the example of Dagestan)
2011 Sh. G. Samedov
Oil company business value and in-ground petroleum reserves value estimation
2011 V. L. Ulanov
Structure of superimposed haloes of deep-seated polymetallic deposits (based on example of Аltaiski krai)
2011 S. G. Alekseev, S. A. Veshev, N. A. Voroshilov, E. G. Margovich, A. P. Nikitichev, A. S. Dukhanin
Development of petroleum corporation in an unstable world energy market
2011 V. M. Vasiltsova, A. P. Maslovsky
Application of inphase response component by low-frequency airborne electroprospecting EM-4H system
2011 A. K. Volkovitskii, E. V. Karshakov, E. V. Moilanen