Submit an Article
Become a reviewer
Vol 194
Pages:
132
Download volume:

Ultra wide band gpr-method: success and problems

Authors:
V. B. Boltintsev1
V. N. Ilyakhin2
K. P. Bezrodnyi3
About authors
  • 1 — BJSC SPF «Geodizond»
  • 2 — BJSC SPF «Geodizond»
  • 3 — JSC NIPII «Lenmetrogiprotrans»
Date submitted:
2010-12-16
Date accepted:
2011-02-22
Date published:
2011-06-01

Abstract

An advanced method of ultra-wide band electromagnetic ground penetrating  probing has been developed. This method enables the running of geological probing measurements from both the surface of the land and the boring face during construction of tunnels up to a depth of one hundred meters, and in special cases, even deeper. Portable equipment of low weight is used for these underground radar measurements. Total weight is not more 15 kg. Time of geological cut measurement and its data processing is approximately 3 hours for probing depths of about 70 m.

Go to volume 194

References

  1. Мощный полупроводниковый генератор наносекундных импульсов / И.В.Грехов, В.М.Ефанов, А.Ф.Кардо-Сысоев, С.В.Шендерей // Приборы и техника эксперимента. 1986. № 1. С.93-94.
  2. Применение метода электромагнитного импульсного сверхширокополосного зондирования при инженерно-геологических изысканиях / В.Б.Болтинцев, В.Н.Ильяхин, А.А.Черемисин, К.П.Безродный, С.Я.Нагорный // Инженерная геология. 2006. № 2. С.72-76.
  3. Свидетельство на полезную модель № 28289. Российская Федерация. 7 H 01 Q 7/00. Антенна для подповерхностного зондирования / В.Б.Болтинцев; заявитель и патентообладатель ЗАО НПФ «Геодизонд». № 2002126446/20; заявл. 07.10.02; опубл. 10.03.03. Бюл. № 7.

Similar articles

Employement of geoelectrical methods for prospecting for hydrocarbon stock in continental conditions of Ukraine
2011 E. M. Sheremet, M. T. Tirkel, V. V. Tumanov, N. G. Agarkova, I. Yu. Nikolaev, A. V. Semenov
Reactive power compensation optimization and its optimization in the electrical network complex
2011 Ya. E. Shklyarskii, I. Gonsales Palau
The perspectives of competitive trade forms development of fuel-energy resources
2011 Yu. N. Vasilev
Phased strategy of drilling manufacture re-structuring and it's economy importance
2011 E. A. Krainova
Problems of improvement of innovation management at the enterprises of fuel and energy complex
2011 E. G. Katysheva
The simulation modelling in deposit project development analysis on the base of Shaidomskoe building stone deposit, «Amphibolithoviy» mining field
2011 Yu. P. Grigorev, E. V. Shevchenko