The simulation modelling in deposit project development analysis on the base of Shaidomskoe building stone deposit, «Amphibolithoviy» mining field
About authors
- 1 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
- 2 — post-graduate student Saint Petersburg State Mining University
Abstract
The article covers the approach to the development project probabilistic estimation of building stone deposit. The approach is based on the Monte-Carlo simulation modelling of its efficiency indicators. Also the correlation and statistical analysis of simulation are conducted.
Область исследования:
(Archived) Economical problems in use of subsurface and development of the mineral resources complex
References
- Ampilov Y.P., Gert A.A. Economic geology. Мoscow, 2006. 409 p.
- Astahov A.S., Goldman E.L. Economics for geologists and economists. Мoscow, 2007. 328 p.
- Vadzinsky R. Statistical computation in MS Excel. Saint Petersburg, 2008. 608 p.
- Mamiy E.A., Baiburtian M.A. Approach to the development of risk analysis method. URL: http://www.cfin.ru/finanalysis/risk/innovative.shtml
- Sobol I.M. Monte-Carlo method. Мoscow, 1978 . 64 р.
Similar articles
Ways of improving the effectiveness of the Russian mineral resources base of scarce minerals reproduction
2011 N. V. Pashkevich, V. S. Khloponina
Ultra wide band gpr-method: success and problems
2011 V. B. Boltintsev, V. N. Ilyakhin, K. P. Bezrodnyi
The intellectual capital is the basis for efficient management of modern oil and gas company
2011 S. V. Razmanova
Resalts of regular transient electromagnetic soundings in the westen part of chuya depression in Gornyy Altai
2011 N. N. Nevedrova, A. M. Sanchaa, S. M. Babushkin