Submit an Article
Become a reviewer
Vol 194
Pages:
79-83
Download volume:
RUS
Article

Technology and management of yakutian kimberlitic tubes underquarry deposits mining at difficlult hydrogeological conditions

Authors:
Vladimir S. Litvinenko1
E. I. Boguslavskii2
M. N. Andreev3
About authors
  • 1 — Ph.D., Dr.Sci. rector Saint Petersburg Mining University ▪ Orcid ▪ Elibrary ▪ Scopus ▪ ResearcherID
  • 2 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
  • 3 — post-graduate student Saint Petersburg State Mining University
Date submitted:
2010-12-18
Date accepted:
2011-02-28
Date published:
2011-12-30

Abstract

Article is in touch with mining industry and devoted to the analysis and generalization of world experience of underground mining of kimberlitic tubes underquarry reserves. In it the urgency of research of new technologies of underground mining of kimberlitic tubes underquarry reserves in the conditions of the deposits, developed by «ALROSA». The mining technology of kimberlitic tubes water-bearing underquarry reserves excavation is described.

Область исследования:
(Archived) Current problems in geology and exploration of mineral deposits
Keywords:
kimberlitic tubes underquarry reserves method of mining water-bearing level aerodynamically connection low intensity
Funding:

None

Go to volume 194

References

  1. Ajnbinder I.I. To a working off problem of underquarry tube reserves «Mir» in the underground way / I.I.Ajnbinder, N.P.Kramskov // Mining magazine. 2000. N 8. P.17-23.
  2. Zamesov N.F. Technical decisions on the accelerated opening and preparation for operation of underquarry reserves of «Mir» diamond tube stocks // Mining magazine. 2000. N 2. P.10-15.
  3. Kalitin V.T. The Diamond-mining complex of Russia: a current state, problems and development prospects // Mining magazine. 2003. N 1. P.110-113.
  4. Kaplunov D.R. The combined geotechnology at development of a diamondiferous deposit of a tube «Udachnaya» / M.V.Rylnikova, V.V.Kalmykov, U.А.Petrov, V.A.Suslov // Mining industry. 2005. N 4. P.21-25.
  5. Osintsev V.A. The complex of opened-underground way of working out of ore deposits with abrupt non-working boards of an open-cast mine» // Mining Magazine of High Schools News. 2005. N 3. P.34-36.

Similar articles

Preparation of iron-ore materials for iron and steel industry
2011 V. L. Trushko, R. E. Dashko, V. B. Kuskov, A. V. Kornev, A. S. Klyamko
Application of the gpr-method for estimation of the condition of fastening of the backslope of soil dams
2011 V. V. Glazunov, S. M. Danilev, N. N. Efimova
New helicopter-borne time-domain airborne electromagnetic «Equator» system
2011 A. K. Volkovitskii, E. V. Karshakov, E. V. Moilanen
Overview of the main risks of the enterprises of mining and metallurgical branches in modern conditions
2011 A. Yu. Tsvetkova
Structure of superimposed haloes of deep-seated polymetallic deposits (based on example of Аltaiski krai)
2011 S. G. Alekseev, S. A. Veshev, N. A. Voroshilov, E. G. Margovich, A. P. Nikitichev, A. S. Dukhanin
Application of optimal complex оf geophysical express-technologies in solution of environmental problems at the territories of industrial and domestic wastes storage
2011 D. A. Gaponov