Submit an Article
Become a reviewer
Vol 195
Pages:
272
Download volume:

Design features of replacement work equipment of peat excavation laoding machine

Authors:
D. O. Nagornov1
E. A. Kremcheev2
About authors
  • 1 — Saint Petersburg State Mining University
  • 2 — Saint Petersburg State Mining University
Date submitted:
2011-07-28
Date accepted:
2011-09-25
Date published:
2012-01-01

Abstract

The article deals with design features a removable desktop equipment peat excavation, loading machine. The analysis of the structures of the working equipment of peat excavation, loading machines. Suggest ways to improve the design of the working equipment of peat excavation, loading machines.

Go to volume 195

References

  1. Афанасьев А.Е. Оптимизация процессов сушки и структурообразования в технологии торфяного производства / А.Е.Афанасьев, Н.В.Чураев. М., 1992.
  2. Кремчеев Э.А. Технологические аспекты обеспечения круглогодовой полевой сушки торфа для нужд малой энергетики / Э.А.Кремчеев, Д.О.Нагорнов // Горный информационно-аналитический бюллетень. М., 2010. № 12. С.260-265.
  3. Михайлов А.В. Перспективы развития новых технологий добычи торфа / А.В.Михайлов, Э.А.Кремчеев, А.В.Большунов, Д.О.Нагорнов // Горный информационно-аналитический бюллетень. 2010. № 9. С.181-192.
  4. Kremcheev E.A. Ecological and technological aspects of use of new peat extraction technology // Innovations in Geoscience, Geoengineering and Metallurgy N 59. Bergund Huttenmannischer Tag 2008. Freiberg, 2008. P.21-23.

Similar articles

Different approaches of assigning the danger range of slime and silt from oil refinery biological treatment unit
2012 K. A. Moiseeva
Tax system in the oil industry Russia
2012 V A. Osovskii
Geomechanical substantiation of stability of the tunnel’s face which situated in the proterozoic clay’s
2012 V. L. Trushko, A. N. Shokov
Methodological aspects of innovative-industrial clusters of mineral-raw specialization
2012 V. P. Skobelina, I. S. Tremasova
Explanation and development of new equipment for drilling rat holes in multilateral wells
2012 R. R. Zaripov, Yu. T. Morozov, A. A. Mukhametshin
Mechanism of real option for the assessment оf risks of the investment project of offshore gas fields development
2012 M. N. Kruk