Study of the ways saving to energy at transport of the oils
About authors
- 1 — student Saint Petersburg State Mining University
- 2 — Ph.D. associate professor Saint Petersburg State Mining University
Abstract
An algorithm for the formation of a job to control the frequency of rotor pumps pumping station, which provides her work with maximum efficiency and productivity change in the transportation of oil. The mathematical description of the algorithm and its geometric interpretation of the example section of the main pipeline with a pumping station. Feasibility of the proposed control method compared with the published methods baypasirovaniya, throttling and the replacement of the rotor.
Область исследования:
(Archived) Topical issues in prospecting and development of oil and gas deposits
Funding:
None
References
- Kolpakov A.G. Operation of the main pumps: Training manual. Ufa, 1988. 116 p.
- Korshak A.A. Design and operation of gas-oil: A textbook for universities / A.A.Korshak, A.M.Nechval. Saint Petersburg, 2008. 488 p.
Similar articles
Microbial activity in mine working and its influence on high-grade iron ore's and constructional material's properties
2012 R. E. Dashko, I. V. Alekseev
The technology analasys a problems оf utilization of bio- and oil slugge on enterprises fuel and energy complex
2012 K. A. Moiseeva, V. A. Rogalev
Ore reclaiming process flowsheets for the cyclical and continuous method of open-cast mining
2012 G. A. Kholodnyakov, A. O. Ipatova, D. A. Ikonnikov, K. R. Argimbaev
Different approaches of assigning the danger range of slime and silt from oil refinery biological treatment unit
2012 K. A. Moiseeva