Abstract

The article deals with design features a removable desktop equipment peat excavation, loading machine. The analysis of the structures of the working equipment of peat excavation, loading machines. Suggest ways to improve the design of the working equipment of peat excavation, loading machines.

Область исследования:
(Archived) Mining electromechanics and mining equipment
Keywords:
peat production the executive body attachments bucket screener crusher
Funding:

None

Go to volume 195

References

  1. Afanas'ev AE, Churaev NV Optimization of drying processes and structure formation in the technology of peat production. Moscow, 1992. 288 р.
  2. Kremcheev EA, Nagorno D.O. Technological aspects of providing year-round field of drying peat for the needs of low-energy // Mining Information and Analytical Bulletin. 2010. N 12. Р. 260-265.
  3. Mihajlov A.V., Kremcheev E.A., Bolshunov A.V., Nagornov D.O. Perspektivy of development of new technologies of extraction of peat: Mining Information and Analytical Bulletin. 2010. N 9. С.181-192.
  4. Kremcheev E.A. Ecological and technological aspects of use of new peat extraction technology // Innovations in Geoscience, Geoengineering and Metallurgy. N 59. Berg-und Huttenmannischer Tag, 2008. Freiberg, 2008. P.21-23.

Similar articles

Analisys of surface water condition of the murmansk district which is exposed to a negative impact оf the mining-enrich industry
2012 V. A. Petrova, V. A. Rogalev
Long face ventilation performance improving in development of seam by pillarless technology
2012 V. S. Elkin
Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger
2012 G. A. Kholodnyakov, K. R. Argimbaev, S. P. Reshetnyak
Geotechnical engineering providing of stability analysis of buildings and structures erected оn the upper vendian clays (Saint Petersburg)
2012 A. M. Zhukova
Optimization of pulse width modulation for multilevel converters of variable-frequency electric drive
2012 A. V. Kudryavtseva, O. B. Shonin
Different approaches of assigning the danger range of slime and silt from oil refinery biological treatment unit
2012 K. A. Moiseeva