Submit an Article
Become a reviewer
Vol 195
Pages:
28
Download volume:
RUS

Engiineering-geological and hydrogeological problems of st. Isaak cathedral’s long-term stability substantiation (Saint-Petersburg)

Authors:
R. E. Dashko1
A. V. Shidlovskaya2
O. Yu. Aleksandrova3
I. V. Alekseev4
About authors
  • 1 — Saint Petersburg State Mining University
  • 2 — Saint Petersburg State Mining University
  • 3 — Saint Petersburg State Mining University
  • 4 — Saint Petersburg State Mining University
Date submitted:
2011-07-09
Date accepted:
2011-09-13
Date published:
2012-04-05

Abstract

In the paper construction specificity of St. Isaak Cathedral’s underground space and engineering geological profile features are considered. The comparative assessment of condition and properties modification of water-saturated quarternary sandy and clay soils during 55 years are taken up (1954-2009). The dynamic of groundwater contamination due to leakage sewers and its aggressiveness are estimated. The researches of microbes activity in soils which are characterized by quasiheavy values are completed. The structural  of complex monitoring to secure of St. Isaak Cathedral long-term stability are proposed.

Go to volume 195

References

  1. Бутиков Г.П., Хвостова Г.А. Исаакиевский собор / Г.П.Бутиков, Г.А.Хвостова. Л., 1974.
  2. Исследования проводились в лаборатории микологии и альгологии Санкт-Петербургского университета под руководством Д.Ю.Власова.
  3. Дашко Р.Э. Инженерно-геологический и геоэкологический анализ причин деформаций Исаакиевского собора / Р.Э.Дашко, О.Ю.Александрова // Реконструкция городов и геотехническое строительство. 2002, № 5.

Similar articles

Possible solution for extraction of gas-bearing coal seams by highly productive mining complexes
2012 A. V. Leisle
Estimation of technogenic risk spatial distribution at aero-technogenic environmental impact оf overburden dump
2012 S. G. Gendler, V. S. Kuznetsov, D. A. Lyubovinkin
Automatic compensation of influence of stirring factors on measurement of coal bulk weight from the clearing face
2012 R. M. Proskuryakov, I. N. Voityuk, A. V. Kopteva
Estimation of atmospheric air pollution аt construction and operation of traffic tunnel
2012 S. G. Gendler, V. A. Rogalev
Self-propellet rail transporting mechanisms with even driving wheels
2012 N. A. Belous, A. V. Bolshunov, G. V. Sokolova
Geomechanical substantiation of stability of the tunnel’s face which situated in the proterozoic clay’s
2012 V. L. Trushko, A. N. Shokov