Article

Estimation of technogenic risk spatial distribution at aero-technogenic environmental impact оf overburden dump

Authors:
S. G. Gendler1
V. S. Kuznetsov2
D. A. Lyubovinkin3
About authors
  • 1 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
  • 2 — Ph.D. associate professor Saint Petersburg State Mining University
  • 3 — student Saint Petersburg State Mining University
Date submitted:
2011-07-22
Date accepted:
2011-09-23
Date published:
2012-04-05

Abstract

It is noted overburden dump which are forming on open-pit mining of mineral deposits, are powerful sources of environment impact, including the population living in areas on which dust pollution extends. Procedure of zonation of the territory surrounding overburden dump on size of technogenic risk is developed. As an example, the assessment of distribution of technogenic risk for conditions of overburden dump of Olenegorsky combine is carried out.

Область исследования:
(Archived) Environmental protection
Keywords:
overburden dump aero-technogenic influence dust pollution environmental technogenic risk
Go to volume 195

References

  1. Yayli E.A. Scientific and applied aspects of an estimation of the urbanized territories management on the basis of the risk tool and new indicators of environment quality / Under the editorship L.N.Karlin. Saint Petersburg, 2006. 448 p.

Similar articles

Engiineering-geological and hydrogeological problems of st. Isaak cathedral’s long-term stability substantiation (Saint-Petersburg)
2012 R. E. Dashko, A. V. Shidlovskaya, O. Yu. Aleksandrova, I. V. Alekseev
Working out innovative dust control devices for conditions of northern regions
2012 Yu. D. Smirnov, S. V. Kovshov, A. V. Ivanov
Geotechnical engineering providing of stability analysis of buildings and structures erected оn the upper vendian clays (Saint Petersburg)
2012 A. M. Zhukova
Prospective ways of diamondiferous rock enrichment wastes utilization at M.V.Lomonosov diamond deposit
2012 A. Yu. Oblitsov, V. A. Rogalev
The designing of the constructions of the pillar underground station with applying of the low-settle building technology
2012 A. G. Protosenya, P. A. Demenkov, M. A. Karasev, N. A. Belyakov, K. P. Bezrodnyi, V. A. Maslak
Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger
2012 G. A. Kholodnyakov, K. R. Argimbaev, S. P. Reshetnyak