Ore reclaiming process flowsheets for the cyclical and continuous method of open-cast mining

Authors:
G. A. Kholodnyakov1
A. O. Ipatova2
D. A. Ikonnikov3
K. R. Argimbaev4
About authors
  • 1 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
  • 2 — student Saint Petersburg State Mining University
  • 3 — post-graduate student Saint Petersburg State Mining University
  • 4 — post-graduate student Saint Petersburg State Mining University
Date submitted:
2011-07-01
Date accepted:
2011-09-13
Date published:
2012-04-05

Abstract

The technique of ore reclaiming process flowsheets with stationary both semiportable crushers and classifying points parameters definition is presented. The best results of ore reclaiming are obtained by unloading ore to the loading bunker from several working faces.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Keywords:
ore reclaiming cyclical and continuous method conveyor crusher screen excavator dump truck classifying point reloading point
Go to volume 195

References

  1. Bastan P.P., BoloshinN.N. Ore reclaiming at concentrating factories. Мoscow, 1981.
  2. Vasiliev M.V. Transport of deep open pit mines. Мoscow, 1983.
  3. Pihtovnikov A.G., Kosolapov A.I., Vashlaev I.I. Estimation of reclaiming efficiency within working faces and its impact on the minimum volume of a reclaiming warehouse with the account of ore quality requirements // Fundaméntal Investigation. 2005. N 2.
  4. Burton A.K. Trucks in Mining // Mining Engineering. 1975. N 8.

Similar articles

Hydro-geological monitoring on the Jakovlevsky mine as implement of increase safety conducting mine second working in difficult mine-geological conditions
2012 R. E. Dashko, E. N. Kovaleva
Geomechanical substantiation of stability of the tunnel’s face which situated in the proterozoic clay’s
2012 V. L. Trushko, A. N. Shokov
Approach to perfection and progress of the industrial infrastructure (on the example of the deposit «Glubokoe» on extraction of plaster in the Arkhangelsk area)
2012 V. A. Modyanova
Analisys of surface water condition of the murmansk district which is exposed to a negative impact оf the mining-enrich industry
2012 V. A. Petrova, V. A. Rogalev
Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger
2012 G. A. Kholodnyakov, K. R. Argimbaev, S. P. Reshetnyak
Synthesis of the mechanism of the effektor of a gathering-arm loader
2012 M. A. Vasileva, A. Yu. Kuzkin, I. P. Timofeev