Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger

Authors:
G. A. Kholodnyakov1
K. R. Argimbaev2
S. P. Reshetnyak3
About authors
  • 1 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
  • 2 — post-graduate student Saint Petersburg State Mining University
  • 3 — Ph.D., Dr.Sci. associate professor, leading technician «Giproshaht»
Date submitted:
2011-07-01
Date accepted:
2011-09-26
Date published:
2012-04-05

Abstract

Development water sated tailing dump are accompanied explosive failure banks even at their height less 10 meters. Thereupon, the problem decision on research competence a slope and to a choice of optimum height production a dredge face «backdigger», established on the top platform tailing dump, will allow to reduce equipment downtimes and to increase intensity mining.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Keywords:
tailing dump excavator «backdigger» tailing height of face algorithm program intensity
Go to volume 195

References

  1. Nurok G.A., Lugovskaya A.G., Sherstukov A.D. Hydraulic-mine dumps at strip-pits. Moscow, 1973.
  2. Fisenko I.V. Stability of open pit slopes. Moscow, 1973.
  3. Kholodnyakov G.A., Argimbaev K.R., Ikonnikov D.A. Determining physical and mechanical properties of tailings of iron-bearing tailing dumps // Mining informational and Analytical Bulletin. Moscow, 2011.
  4. Kholodnyakov G.A., Argimbaev K.R., Ikonnikov D.A. Excavating and loading equipment for the development of semi-dry tailing dumps // Development of mineral resources of the North. Problems and solutions. Vorkuta, 2011. Vol. 1.

Similar articles

The development of the hydrophobic emulsion composition for oil well remedial work
2012 A. R. Mavliev, M. K. Rogachev, D. V. Mardashov, M. V. Naugolnov
Devonian organic massif in the basins of the rivers Kara-Silovayaha (the southest Pai-Hoi)
2012 A. L. Zherlygin
The analysis of the current state and ways to improve the effectiveness of the Russian mineral resource base reproduction
2012 V. S. Khloponina
The improvement of engineering – geological information reliability based on studying the influence of some factors of technogenic effect on the sand-clay soils
2012 K. V. Pankratova
Self-propellet rail transporting mechanisms with even driving wheels
2012 N. A. Belous, A. V. Bolshunov, G. V. Sokolova
Hydro-geological monitoring on the Jakovlevsky mine as implement of increase safety conducting mine second working in difficult mine-geological conditions
2012 R. E. Dashko, E. N. Kovaleva