Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger
About authors
- 1 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
- 2 — post-graduate student Saint Petersburg State Mining University
- 3 — Ph.D., Dr.Sci. associate professor, leading technician «Giproshaht»
Abstract
Development water sated tailing dump are accompanied explosive failure banks even at their height less 10 meters. Thereupon, the problem decision on research competence a slope and to a choice of optimum height production a dredge face «backdigger», established on the top platform tailing dump, will allow to reduce equipment downtimes and to increase intensity mining.
Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
References
- Nurok G.A., Lugovskaya A.G., Sherstukov A.D. Hydraulic-mine dumps at strip-pits. Moscow, 1973.
- Fisenko I.V. Stability of open pit slopes. Moscow, 1973.
- Kholodnyakov G.A., Argimbaev K.R., Ikonnikov D.A. Determining physical and mechanical properties of tailings of iron-bearing tailing dumps // Mining informational and Analytical Bulletin. Moscow, 2011.
- Kholodnyakov G.A., Argimbaev K.R., Ikonnikov D.A. Excavating and loading equipment for the development of semi-dry tailing dumps // Development of mineral resources of the North. Problems and solutions. Vorkuta, 2011. Vol. 1.
Similar articles
Way remote magnitometrichesky control of the technical condition of the main pipelines
2012 A. N. Lyubchik
The distribution of late quaternary glacial-marine deposite on the norternmost part оf Novaya Zemlya shelf
2012 D. E. Dorechkina, P. V. Rekant, D. A. Korshunov, A. D. Portnov
Possible solution for extraction of gas-bearing coal seams by highly productive mining complexes
2012 A. V. Leisle