Article

Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger

Authors:
G. A. Kholodnyakov1
K. R. Argimbaev2
S. P. Reshetnyak3
About authors
  • 1 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
  • 2 — post-graduate student Saint Petersburg State Mining University
  • 3 — Ph.D., Dr.Sci. associate professor, leading technician «Giproshaht»
Date submitted:
2011-07-01
Date accepted:
2011-09-26
Date published:
2012-04-05

Abstract

Development water sated tailing dump are accompanied explosive failure banks even at their height less 10 meters. Thereupon, the problem decision on research competence a slope and to a choice of optimum height production a dredge face «backdigger», established on the top platform tailing dump, will allow to reduce equipment downtimes and to increase intensity mining.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Keywords:
tailing dump excavator «backdigger» tailing height of face algorithm program intensity
Funding:

None

Go to volume 195

References

  1. Nurok G.A., Lugovskaya A.G., Sherstukov A.D. Hydraulic-mine dumps at strip-pits. Moscow, 1973.
  2. Fisenko I.V. Stability of open pit slopes. Moscow, 1973.
  3. Kholodnyakov G.A., Argimbaev K.R., Ikonnikov D.A. Determining physical and mechanical properties of tailings of iron-bearing tailing dumps // Mining informational and Analytical Bulletin. Moscow, 2011.
  4. Kholodnyakov G.A., Argimbaev K.R., Ikonnikov D.A. Excavating and loading equipment for the development of semi-dry tailing dumps // Development of mineral resources of the North. Problems and solutions. Vorkuta, 2011. Vol. 1.

Similar articles

Hydro-geological monitoring on the Jakovlevsky mine as implement of increase safety conducting mine second working in difficult mine-geological conditions
2012 R. E. Dashko, E. N. Kovaleva
Engiineering-geological and hydrogeological problems of st. Isaak cathedral’s long-term stability substantiation (Saint-Petersburg)
2012 R. E. Dashko, A. V. Shidlovskaya, O. Yu. Aleksandrova, I. V. Alekseev
Automatic adjustment of metrology performance meter random signal transducer analyzer liquid flows
2012 R. M. Proskuryakov, A. V. Kopteva, I. N. Voityuk
Microbial activity in mine working and its influence on high-grade iron ore's and constructional material's properties
2012 R. E. Dashko, I. V. Alekseev
Test bench for experimental studies of potash ores cutting with a single cutter of mining machines
2012 V. V. Gabov, A. D. Shefner, D. I. Shishlyannikov, N. V. Chekmasov
The distribution of late quaternary glacial-marine deposite on the norternmost part оf Novaya Zemlya shelf
2012 D. E. Dorechkina, P. V. Rekant, D. A. Korshunov, A. D. Portnov