Submit an Article
Become a reviewer
Vol 195
Pages:
138-141
Download volume:
RUS
Article

Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger

Authors:
G. A. Kholodnyakov1
K. R. Argimbaev2
S. P. Reshetnyak3
About authors
  • 1 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
  • 2 — post-graduate student Saint Petersburg State Mining University
  • 3 — Ph.D., Dr.Sci. associate professor, leading technician «Giproshaht»
Date submitted:
2011-07-01
Date accepted:
2011-09-26
Date published:
2012-04-05

Abstract

Development water sated tailing dump are accompanied explosive failure banks even at their height less 10 meters. Thereupon, the problem decision on research competence a slope and to a choice of optimum height production a dredge face «backdigger», established on the top platform tailing dump, will allow to reduce equipment downtimes and to increase intensity mining.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Keywords:
tailing dump excavator «backdigger» tailing height of face algorithm program intensity
Go to volume 195

References

  1. Nurok G.A., Lugovskaya A.G., Sherstukov A.D. Hydraulic-mine dumps at strip-pits. Moscow, 1973.
  2. Fisenko I.V. Stability of open pit slopes. Moscow, 1973.
  3. Kholodnyakov G.A., Argimbaev K.R., Ikonnikov D.A. Determining physical and mechanical properties of tailings of iron-bearing tailing dumps // Mining informational and Analytical Bulletin. Moscow, 2011.
  4. Kholodnyakov G.A., Argimbaev K.R., Ikonnikov D.A. Excavating and loading equipment for the development of semi-dry tailing dumps // Development of mineral resources of the North. Problems and solutions. Vorkuta, 2011. Vol. 1.

Similar articles

Probabilistic approach to the assessment of energy transmissions of mining machines
2012 I. E. Zvonarev, A. S. Fokin, S. L. Ivanov
Analysis of rheological properties оf yaregskoe field heavy high-viscosity oil
2012 M. N. Nikitin, P. D. Gladkov, A. V. Kolonskikh, A. V. Petukhov, A. I. Mikheev
Geomechanical substantiation of stability of the tunnel’s face which situated in the proterozoic clay’s
2012 V. L. Trushko, A. N. Shokov
Mechanism of real option for the assessment оf risks of the investment project of offshore gas fields development
2012 M. N. Kruk
Optimization of pulse width modulation for multilevel converters of variable-frequency electric drive
2012 A. V. Kudryavtseva, O. B. Shonin
The improvement of engineering – geological information reliability based on studying the influence of some factors of technogenic effect on the sand-clay soils
2012 K. V. Pankratova