Submit an Article
Become a reviewer
Vol 195
Pages:
98-102
Download volume:
RUS
Article

Rationale for choice of technological schemes of producing aggregates by open-cast mine with mobile crushing and grading complex

Authors:
V. V. Ivanov1
A. A. Faul2
A. N. Kuznetsov3
About authors
  • 1 — Ph.D. assistant lecturer Saint Petersburg State Mining University
  • 2 — post-graduate student Saint Petersburg State Mining University
  • 3 — student Saint Petersburg State Mining University
Date submitted:
2011-07-13
Date accepted:
2011-09-12
Date published:
2012-04-05

Abstract

Variants of technological schemes of aggregates production by open-cast mine with mobile crushing and grading units is described. The measures to improve safety in open-cast mining are offered, and also ways to increase productivity of open-cast mines by changing the technological schemes and reducing the number of movements of mobile crushing and screening units.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Keywords:
deposit open-cast mine excavator crushing and screening plant aggregates technology production productivity
Go to volume 195

References

  1. Chirkov A.S. Extraction and processing of building rocks, Moscow, 2001. 623 p.

Similar articles

Analysis of rheological properties оf yaregskoe field heavy high-viscosity oil
2012 M. N. Nikitin, P. D. Gladkov, A. V. Kolonskikh, A. V. Petukhov, A. I. Mikheev
Different approaches of assigning the danger range of slime and silt from oil refinery biological treatment unit
2012 K. A. Moiseeva
Estimation of technogenic risk spatial distribution at aero-technogenic environmental impact оf overburden dump
2012 S. G. Gendler, V. S. Kuznetsov, D. A. Lyubovinkin
Automatic adjustment of metrology performance meter random signal transducer analyzer liquid flows
2012 R. M. Proskuryakov, A. V. Kopteva, I. N. Voityuk
Comparative analysis of the quartz aggregates fabric of different genesis
2012 E. L. Kotova
Estimation of atmospheric air pollution аt construction and operation of traffic tunnel
2012 S. G. Gendler, V. A. Rogalev