Application of digital levels for rainall structures monitoring
Authors:
About authors
- student Saint Petersburg State Mining University
Abstract
Due to the ever-increasing housing density and increased demands on outdated municipal communications, which often forces the builders to work on updating and expanding the network of underground facilities in areas where it is imperative to ensure a minimal impact on the earth's surface. The study examined possible methods for reducing time and material resources to carry out observations of the settling of the objects in the construction zone.
Область исследования:
(Archived) Geodesy, geomechanics and underground construction
References
- Kolesnikov G.V. Leveling rods coding techniques. Novosibirsk, 2009.
Similar articles
Typomorfic features of the zircon from Verchneurmijsky granite massif (Priamurye)
2012 M. M. Machevariani, V. I. Alekseev
New information (date) on the delivery of green mineral and alumina lumps аnd two typesetting images for the cadet church to the Saint-Petersburg mining cadet corps
2012 S. Yu. Stepanov, Yu. V. Zhirnov
Heritage of the brick or information embedded in the brick from historical viewpoint
2012 E. M. Kuritsyn
Specification of parameters of the investment valuation of the project on the method оf real options
2012 S. V. Lysak