Submit an Article
Become a reviewer
Vol 197
Pages:
147-150
Download volume:
RUS
Article

PRediction of spatial stress-strain double-track tunnels Frunzensky radius Saint Petersburg underground

Authors:
A. G. Protosenya1
I. K. Suprun2
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (University of Mines)
  • 2 — post-graduate student National Mineral Resources University (University of Mines)
Date submitted:
2011-09-10
Date accepted:
2011-11-01
Date published:
2012-05-25

Abstract

In this article the analysis of the stress-strain state of the external and internal contours of the lining, which appears during the process of the drilling of tunnels with using of contledge of the face which applied in Tunnel Boring Machines, is adduced. The finite element method diagrams obtained the minimum and maximum principal stresses on the outer and inner contours of output. Relationship obtained in the surface sediments depending on the depth of the tunnels.

Область исследования:
(Archived) Present-day problems of geomechanics, mining practice and innovation technologies in mining engineering
Keywords:
tunnel Tunnel Boring Machines contledge face stress earth’s surface yielding
Funding:

None

Go to volume 197

References

  1. Bulychev N.S. The mechanics of underground structures: Manual for university. Moscow, 1994.
  2. Garber V.A. Volume modeling of the transport tunnel construction / V.A.Garber, A.A.Kashko, D.V.Panfilov // Sabway and Tu nnels . 2004. N 5.
  3. Lars Langmaak. Conditioning the soil. Advanced technology for tunneling shield with ground of the working face // Subway and Tunnels. 2005. N 4.
  4. Starkov A.Yu. The technology of building double-track tunnels of the St. Petersburg Metro // Subway and Tunnels. 2011. N 2.

Similar articles

History of accident and social insurance in russia
2012 A. N. Shabarov, G. I. Korshunov, Z. N. Cherkai, N. V. Mukhina, E. B. Gridina
Technical equipments for realization investigation works on shelf of arctic seas
2012 V. P. Onishchin
The classification and quantitative assessment of innovation project risks
2012 Yu. A. Kulik, V. N. Volovich, N. G. Privalov, A. N. Kozlovskii
The method of contact zone ore-waste rock optimum development
2012 V. V. Kvitka, S. I. Fomin, P. B. Kava
Tendencies in the change in physical and mechanical properties of the vendian clay formation (North Western edge of the Russian platform)
2012 V. G. Rumynin, A. M. Nikulenkov
Russian mineral companies under the condition of the world trade organisation functioning
2012 N. V. Pashkevich, A. A. Fedchenko, L. I. Iseeva