Submit an Article
Become a reviewer
Vol 197
Pages:
165-168
Download volume:
RUS
Article

The method of contact zone ore-waste rock optimum development

Authors:
V. V. Kvitka1
S. I. Fomin2
P. B. Kava3
About authors
  • 1 — Ph.D., Dr.Sci. director MekhanobrʼCo
  • 2 — Ph.D., Dr.Sci. professor National Mineral Resources University (University of Mines)
  • 3 — post-graduate student National Mineral Resources University (University of Mines)
Date submitted:
2011-09-17
Date accepted:
2011-11-23
Date published:
2012-05-25

Abstract

The equation to calculate economic damage from losses and dilution of minerals is given in dynamic type. The optimum height of immixed rocks triangle on minimum economic damage from losses and dilution criterion is determined. The equation for determination of the optimum safety berm width when forming the final edge of an open pit is presented.

Область исследования:
(Archived) Present-day problems of geomechanics, mining practice and innovation technologies in mining engineering
Keywords:
economic damage standardization losses immixing dilution safety berm
Funding:

None

Go to volume 197

References

  1. Aristov I.I., Rubtsov S.K. Enhancement of ore standardization and accounting methods at open pit mining of complex structure deposits // Subsurface resources management. XXI century . 2006. N 1.

Similar articles

Development and technological background of diamond bits
2012 Yu. E. Budyukov, V. I. Spirin, V. P. Onishchin
Milestones in the history of the protection of labor
2012 A. N. Shabarov, G. I. Korshunov, Z. N. Cherkai, N. V. Mukhina
The monitoring of gidrogeomehanical processes during the flooding of Angero-Sudgensk mines
2012 N. A. Kutepova, Yu. I. Kutepov, A. N. Shabarov
Rock-destroying tool development for ice well drilling
2012 Vladimir S. Litvinenko, N. I. Vasilev
Control of air quality during the building of underground construction
2012 V. L. Trushko, S. G. Gendler, A. A. Yakovenko
Environmental factors in case of appraisal of groundwater resources
2012 V. V. Antonov