Wells drilling with hydrotransport of drill core

Authors:
Yu. E. Budyukov1
V. I. Spirin2
About authors
  • 1 — Ph.D., Dr.Sci. OJSC «Tulskoe NIGP»
  • 2 — Ph.D., Dr.Sci. OJSC «Tulskoe NIGP»
Date submitted:
2011-09-19
Date accepted:
2011-11-20
Date published:
2012-05-25

Abstract

The work is devoted to development and new technology hydraulic transport drill core of drill-hole returns on Buryatgold deposites. Scheme and basis parameters of drilling are given.

Область исследования:
(Archived) Present-day problems of geological exploration and well drilling
Keywords:
drilling drill pipe diamond bit drill core upflow drill rate solid phase
Funding:

None

Go to volume 197

Similar articles

Superdeep desiliconization aluminate solution based on calcium hydrocarboaluminates
2012 V. M. Sizyakov, E. S. Kononenko, E. V. Sizyakova
Modern instruments of quantitative risk analysis and risk assessment of innovation projects
2012 N. G. Privalov, A. N. Kozlovskii, V. N. Petrov
Control of air quality during the building of underground construction
2012 V. L. Trushko, S. G. Gendler, A. A. Yakovenko
Assessment of groundwater limitations in the context of Saint-Petersburg territory development
2012 V. V. Antonov
Deep open pit walls design using rock mass stress-strained state
2012 S. P. Reshetnyak, Yu. V. Fedotova, S. N. Savchenko
Integrated technology phosphogypsum processing conversion method with ammonium sulfate, phosphomel and new products
2012 V. M. Sizyakov, S. V. Nutrikhina, B. V. Levin