Submit an Article
Become a reviewer
Vol 197
Pages:
68-70
Download volume:
RUS
Article

Wells drilling with hydrotransport of drill core

Authors:
Yu. E. Budyukov1
V. I. Spirin2
About authors
  • 1 — Ph.D., Dr.Sci. OJSC «Tulskoe NIGP»
  • 2 — Ph.D., Dr.Sci. OJSC «Tulskoe NIGP»
Date submitted:
2011-09-19
Date accepted:
2011-11-20
Date published:
2012-05-25

Abstract

The work is devoted to development and new technology hydraulic transport drill core of drill-hole returns on Buryatgold deposites. Scheme and basis parameters of drilling are given.

Область исследования:
(Archived) Present-day problems of geological exploration and well drilling
Keywords:
drilling drill pipe diamond bit drill core upflow drill rate solid phase
Funding:

None

Go to volume 197

Similar articles

Commercialization of results of scientific researches and development as factor of innovative development of economy
2012 V. A. Knysh
Separation of iron (III), aluminum and lanthanides extraction by naphthenic acids
2012 S. V. Zhukov, T. E. Litvinova, D. E. Chirkst
Control of air quality during the building of underground construction
2012 V. L. Trushko, S. G. Gendler, A. A. Yakovenko
Rationale for the development of the method of existing iron typetailing gully
2012 V. I. Ekgardt, V. V. Kvitka, G. A. Kholodnyakov, K. R. Argimbaev
Russian mineral companies under the condition of the world trade organisation functioning
2012 N. V. Pashkevich, A. A. Fedchenko, L. I. Iseeva
Superdeep desiliconization aluminate solution based on calcium hydrocarboaluminates
2012 V. M. Sizyakov, E. S. Kononenko, E. V. Sizyakova