Wells drilling with hydrotransport of drill core
About authors
- 1 — OJSC «Tulskoe NIGP»
- 2 — OJSC «Tulskoe NIGP»
Abstract
The work is devoted to development and new technology hydraulic transport drill core of drill-hole returns on Buryatgold deposites. Scheme and basis parameters of drilling are given.
Similar articles
Formation of cracks in breeds of the face оf the chink under the influence of chisel cutters
2012 L. K. Gorshkov, V. G. Gorelikov
Structural and petrophysical characteristics оf intraplate geodynamic settings of the Barents-Kara region and Northern margin of Eurasian continent
2012 A. S. Egorov, O. E. Smirnov
Plagioclase’s iridescent as mineralogical sign of pegmatites with large-crystalline muscovite (North Baikal muscovite province)
2012 M. A. Ivanov, A. P. Simakov
Structural approach to complex dynamic object fault detection and localization
2012 L. B. Poshekhonov, M. Yu. Shestopalov