Abstract

The work is devoted to development and new technology hydraulic transport drill core of drill-hole returns on Buryatgold deposites. Scheme and basis parameters of drilling are given.

Область исследования:
(Archived) Present-day problems of geological exploration and well drilling
Keywords:
drilling drill pipe diamond bit drill core upflow drill rate solid phase
Go to volume 197

Similar articles

Restructuring of a company as a tool of a competitive growth under unstable economic conditions
2012 I. B. Sergeev, E. V. Viktorova
Plagioclase’s iridescent as mineralogical sign of pegmatites with large-crystalline muscovite (North Baikal muscovite province)
2012 M. A. Ivanov, A. P. Simakov
The method of analysis stress-and-strain state оf a rock massif with regard to nonlinear character of straining process
2012 A. P. Gospodarikov, M. V. Maksimenko
Development and technological background of diamond bits
2012 Yu. E. Budyukov, V. I. Spirin, V. P. Onishchin
Stress state of entries support when stocks of ore mine Vostochny are developing by combined open-pit and underground method
2012 A. G. Protosenya, A. D. Kuranov
The method of contact zone ore-waste rock optimum development
2012 V. V. Kvitka, S. I. Fomin, P. B. Kava