Submit an Article
Become a reviewer
Vol 197
Pages:
29-33
Download volume:
RUS
Article

Design features of diamond crowns for drilling of breeds with cracks rocks

Authors:
V. G. Gorelikov
About authors
  • Ph.D., Dr.Sci. professor National Mineral Resources University (University of Mines)
Date submitted:
2011-09-05
Date accepted:
2011-11-08
Date published:
2012-05-25

Abstract

The analysis of design data of diamond crowns is made. Feature of work of diamond crowns is noted at drilling of rocks, principal views of deterioration of diamonds and a matrix. Are given rekomendatsi on perfection of diamond crowns.

Область исследования:
(Archived) Present-day problems of geological exploration and well drilling
Keywords:
the analysis diamond a matrix a diamond crown channels a chisel trifle deterioration
Funding:

None

Go to volume 197

References

  1. Bashkatov D.N. Research of influence of a mode of washing on process of formation of facets on diamond im-pregn irova nny Crowns / D.N.Bashkatov, C.K.Kudaykulov // Application of synthetic diamonds in drilling. Saint Petersburg , 1992. P.81- 85.
  2. Isonkin A.M. Influence of the size of sectors of a crown on indicators of its working capacity / A.M.Isonkin's, R.K. Bogdanov // Scientific and technical achievements and best practices in area of geology and investigation of a sub-soil . Мoscow, 1992. Vol .11. P .45- 48.
  3. Kochkarev A.V. Modern idea of the mechanism of self -jamming of a core / A.V.Kochkarev, D.N.Bashkatov. Мoscow, 1987.
  4. Mpezo Mavambo. Research of influence of design data of a diamond crown on its working capacity // Notesof Mi ning Institute. Saint Petersburg, 2002. Vol .152. P. 133- 134.
  5. Ponomarev P.P. Diamond drilling of treshchinovaty breeds. Leningrad, 1985.
  6. Chikhotkin Z.F. Influence of design features of the flushing channel of an impregnirovanny crown on destruction of rocks / Z.F.Chikhotkin, R.K.Bogdanov, A.P.Zakora // Improvement of equipment and technology of drilling of wells on firm minerals: Notes of mining institution UGTTТА . Yekaterinburg, 1996. Vol .19. P .68-78

Similar articles

Drilling of deep geological prospecting wells in Norilsk region
2012 Yu. E. Budyukov, V. I. Spirin, V. P. Onishchin
Geological risks insurance as an element оf the organizational and economic mechanism of increasing investment attractiveness оf the russian mineral resources base of scarce minerals reproduction process
2012 N. V. Pashkevich, V. S. Khloponina
Acceptable risk assessment of production in mining industry
2012 A. N. Shabarov, G. I. Korshunov, E. G. Buldakova, Z. N. Cherkai
Analysis of robust capacity wells of foamed cements
2012 A. A. Yakovlev
Mathematical model of the distribution оf temperature in the hole and the surrounding mountain range when applying foamed cements
2012 A. A. Yakovlev
Diagnostics of continuous technological process based on fuzzy topological identification
2012 M. Yu. Shestopalov, Yu. A. Korablev