Land measuring at substracture construction of Mariinsky theatre second stage in Saint Petersburg
Authors:
About authors
- 1 — Petersburg State Transport University
- 2 — Petersburg State Transport University
- 3 — Petersburg State Transport University
- 4 — Petersburg State Transport University
- 5 — Petersburg State Transport University
- 6 — Petersburg State Transport University
Abstract
The implementation technique of land measuring at construction of Mariinsky theatre second stage in Saint Petersburg is presented. Basic steps of these works, such as designing, creation and monitoring of supporting geodetic network, land measuring at the establishment of experimental trench, land measuring at substracture construction of the theatre, precipitation and circumferential building careens supervision are investigated in detail.
Similar articles
Rationale for assessing the degree of fracturing rock mass by gpr based on mathematical modeling
2012 V. V. Glazunov, S. M. Danilev
Modeling of stress-strain state of ore massive Yakovlevsky caused by mining works under the protection ceiling
2012 O. V. Trushko, A. V. Streletskii
Stress and strain state of «soil – pile foundations» for varios stages of high-rise building construction
2012 D. A. Potemkin, P. A. Demenkov, V. N. Ochnev, A. D. Kuranov
Complex method of assesing mechanical condition of rocks in vicinity storehouses of radioactive waste
2012 O. V. Kovalev, S. P. Mozer, I. Yu. Tkhorikov