Land measuring at substracture construction of Mariinsky theatre second stage in Saint Petersburg
Authors:
About authors
- 1 — post-graduate student Petersburg State Transport University
- 2 — associate professor Petersburg State Transport University
- 3 — Ph.D. associate professor Petersburg State Transport University
- 4 — senior lecturer Petersburg State Transport University
- 5 — Ph.D. associate professor Petersburg State Transport University
- 6 — Ph.D. associate professor Petersburg State Transport University
Abstract
The implementation technique of land measuring at construction of Mariinsky theatre second stage in Saint Petersburg is presented. Basic steps of these works, such as designing, creation and monitoring of supporting geodetic network, land measuring at the establishment of experimental trench, land measuring at substracture construction of the theatre, precipitation and circumferential building careens supervision are investigated in detail.
Область исследования:
(Archived) Engineering geodesy and urban cadastre
Funding:
None
Similar articles
Formation and development of mining-and-geological processes in relation to changes in engineering-geological and hydrogeological conditions on Yakovlevsky mine
2012 R. E. Dashko, E. N. Feller
Use of hydrogeomechanical monitoring during shielding tunnel for underground station оf Saint Petersburg subway «Admiralteiskaya»
2012 Yu. A. Norvatov, I. B. Petrova, M. V. Sergutin
About determination of potential sliding surface based on stress analysis in pit wall solid
2012 P. I. Yushmanov
Substantiating of plasma-pulse technology use to increase oil recovery on high-viscosity oil fields
2012 A. A. Molchanov, I. E. Dolgii, A. V. Kozlov