Land measuring at substracture construction of Mariinsky theatre second stage in Saint Petersburg
Authors:
About authors
- 1 — post-graduate student Petersburg State Transport University
- 2 — associate professor Petersburg State Transport University
- 3 — Ph.D. associate professor Petersburg State Transport University
- 4 — senior lecturer Petersburg State Transport University
- 5 — Ph.D. associate professor Petersburg State Transport University
- 6 — Ph.D. associate professor Petersburg State Transport University
Abstract
The implementation technique of land measuring at construction of Mariinsky theatre second stage in Saint Petersburg is presented. Basic steps of these works, such as designing, creation and monitoring of supporting geodetic network, land measuring at the establishment of experimental trench, land measuring at substracture construction of the theatre, precipitation and circumferential building careens supervision are investigated in detail.
Область исследования:
(Archived) Engineering geodesy and urban cadastre
Similar articles
Investigation of the parameters of stressstate nearbord arrays based sequence miningcombined with open-underground mining diamond mine
2012 A. G. Protosenya, A. D. Kuranov, A. N. Shokov
Features of pumping of the liquefied hydrocarbonic gases on pipelines
2012 E. I. Krapivskii, O. F. Putikov, V. M. Pisarevskii
Geomechanical justification of design parameters of room-and-pillar mining system for designing оf deep-lying horizons of SYBR
2012 D. V. Sidorov
Changes in strain and slope geostructural block in the preparation and realization of technogenic eathquake
2012 A. A. Kozyrev, M. M. Kagan, K. N. Konstantinov, D. V. Zhirov