Land measuring at substracture construction of Mariinsky theatre second stage in Saint Petersburg
Authors:
About authors
- 1 — post-graduate student Petersburg State Transport University
- 2 — associate professor Petersburg State Transport University
- 3 — Ph.D. associate professor Petersburg State Transport University
- 4 — senior lecturer Petersburg State Transport University
- 5 — Ph.D. associate professor Petersburg State Transport University
- 6 — Ph.D. associate professor Petersburg State Transport University
Abstract
The implementation technique of land measuring at construction of Mariinsky theatre second stage in Saint Petersburg is presented. Basic steps of these works, such as designing, creation and monitoring of supporting geodetic network, land measuring at the establishment of experimental trench, land measuring at substracture construction of the theatre, precipitation and circumferential building careens supervision are investigated in detail.
Область исследования:
(Archived) Engineering geodesy and urban cadastre
Funding:
None
Similar articles
Valuation of sustainable of pit wall based on data of digital photography of outcrop surfaces
2012 M. G. Mustafin, A. P. Sannikova
Changes in strain and slope geostructural block in the preparation and realization of technogenic eathquake
2012 A. A. Kozyrev, M. M. Kagan, K. N. Konstantinov, D. V. Zhirov
Hydrogeological conditions effect on safety of underground space expansion during transport tunnel construction
2012 R. E. Dashko, P. V. Kotyukov, A. V. Shidlovskaya
Modeling of stress-strain state of ore massive Yakovlevsky caused by mining works under the protection ceiling
2012 O. V. Trushko, A. V. Streletskii