Land measuring at substracture construction of Mariinsky theatre second stage in Saint Petersburg
Authors:
About authors
- 1 — post-graduate student Petersburg State Transport University
- 2 — associate professor Petersburg State Transport University
- 3 — Ph.D. associate professor Petersburg State Transport University
- 4 — senior lecturer Petersburg State Transport University
- 5 — Ph.D. associate professor Petersburg State Transport University
- 6 — Ph.D. associate professor Petersburg State Transport University
Abstract
The implementation technique of land measuring at construction of Mariinsky theatre second stage in Saint Petersburg is presented. Basic steps of these works, such as designing, creation and monitoring of supporting geodetic network, land measuring at the establishment of experimental trench, land measuring at substracture construction of the theatre, precipitation and circumferential building careens supervision are investigated in detail.
Область исследования:
(Archived) Engineering geodesy and urban cadastre
Funding:
None
Similar articles
About the necessity of accounting of geodinamically active fractures zones in cadastral valuation оf settlement earths
2012 V. A. Kiselev, O. A. Tributs
About the problem of shafts projecting and building in the conditions of modern market relations
2012 F. I. Yagodkin, V. A. Kurnakov, M. S. Pleshakov
On cosmic rotation-pulsatory cycles of the Earth and the natural-technogeneous status of objects in underground space under conditions of geodynamic instability and solar depression in 1982-2065
2012 B. G. Tarasov, E. K. Melnikov, L. V. Bugaenko
Use of hydrogeomechanical monitoring during shielding tunnel for underground station оf Saint Petersburg subway «Admiralteiskaya»
2012 Yu. A. Norvatov, I. B. Petrova, M. V. Sergutin