Land measuring at substracture construction of Mariinsky theatre second stage in Saint Petersburg
Authors:
About authors
- 1 — post-graduate student Petersburg State Transport University
- 2 — associate professor Petersburg State Transport University
- 3 — Ph.D. associate professor Petersburg State Transport University
- 4 — senior lecturer Petersburg State Transport University
- 5 — Ph.D. associate professor Petersburg State Transport University
- 6 — Ph.D. associate professor Petersburg State Transport University
Abstract
The implementation technique of land measuring at construction of Mariinsky theatre second stage in Saint Petersburg is presented. Basic steps of these works, such as designing, creation and monitoring of supporting geodetic network, land measuring at the establishment of experimental trench, land measuring at substracture construction of the theatre, precipitation and circumferential building careens supervision are investigated in detail.
Область исследования:
(Archived) Engineering geodesy and urban cadastre
Similar articles
Building of construction pit and investigation of displacement wall of the secant pile
2012 S. V. Stepanenko
Application of radar scanning system GPRI-2 for monitoring the eath’s surface displacement
2012 M. G. Mustafin, A. K. Omarova, D. V. Mozer
Experience of works on the waterproofing of underground constructions
2012 V. M. Dianov, A. V. Savich, K. S. Pashin, S. A. Grafkin