Article

Investigation of the parameters of stressstate nearbord arrays based sequence miningcombined with open-underground mining diamond mine

Authors:
A. G. Protosenya1
A. D. Kuranov2
A. N. Shokov3
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — post-graduate student National Mineral Resources University (Mining University)
  • 3 — post-graduate student National Mineral Resources University (Mining University)
Date submitted:
2011-11-17
Date accepted:
2012-01-26
Date published:
2012-12-29

Abstract

The parameters of the stress state of nearbord massif of deep open pit on the example of the field development of the V.Grib. This research was done by numerical simulation using finite elements method.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
nearbord massif underpit massif open pit stress
Funding:

None

Go to volume 199

References

  1. Kaplunov D.R. Combined geotechnology / D.R.Kaplunov,V.N.Kalmykov, M.V.Rylnikova. Moscow, 2003. 560 p.
  2. Kuranov AD. Regularities of formation of the sliding surfaces of slopes excavations in different soils and loading conditions / A.D.Kuranov, P.A.Demenkov // Improvement of the technology of construction of mines and underground struc-tures. Sat Nauchn. works. Issue 17. Donetsk, 2011. P.260-264.

Similar articles

Automatic interpretation technology of aerial and satellite images according to different methods of land cover for protected areas
2012 A. A. Bogolyubova
Formation and development of mining-and-geological processes in relation to changes in engineering-geological and hydrogeological conditions on Yakovlevsky mine
2012 R. E. Dashko, E. N. Feller
Historical analysis of the system of estimation and expert’s examination of explored ore reserves in Russia
2012 A. V. Kozlov, V. A. Stepanov, I. G. Kiryakova, A. N. Evdokimov
Estimation of condition tubbing lining escalator tunnel of metro station «Admiralty» by results of lazerno-scanning survey
2012 V. K. Nosov
Prediction of the mine working stability in the massif which are crossing zone of weakening
2012 M. G. Popov
About the problem of shafts projecting and building in the conditions of modern market relations
2012 F. I. Yagodkin, V. A. Kurnakov, M. S. Pleshakov