Submit an Article
Become a reviewer
Vol 199
Pages:
78-83
Download volume:
RUS
Article

Methodology of the complex estimation of influence of tectonic disturbances on stability of the rock mass at mining of rock-bump hazardous ore deposits difficult geologic structure

Authors:
D. V. Sidorov
About authors
  • Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2011-11-19
Date accepted:
2012-01-20
Date published:
2012-12-29

Abstract

Positions of methodology of a complex estimation of influence of tectonic disturbances on stability of a rock mass for conditions of mining of ore deposits of a difficult geologic structure are considered. Degree of stability of a rock mass and constructive elements of mining methods in zones of influence of tectonic disturbances is estimated on size of an increment of stresses from action of motions on a contact surface of a tectonic disturbance.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
Methodology tectonic disturbances destruction zones a rock mass ore deposit stresses movings dynamic pressure
Go to volume 199

References

  1. Bezuhov N.I. Bases of the theory of elasticity, plas-ticity and creep. М, 1966.
  2. Sidorov D.V. To calculation of stresses in bearing elements of chamber-and-pillar mining method // The moun-tain information-analytical bulletin. 1999.
  3. Timoshenko S.P., Guder J. The elasticity theory.Moscow, 1975.

Similar articles

Analysis of load formation on lining of tunnel constructed in soil with nonlinear behavior
2012 A. G. Protosenya, V. I. Semenov, I. K. Suprun
Development of the composition and technology for industrial production of an emulsifier used in oil рroduction for inverse water-in-oil emulsions
2012 N. K. Kondrasheva, M. K. Rogachev
Substantiating of plasma-pulse technology use to increase oil recovery on high-viscosity oil fields
2012 A. A. Molchanov, I. E. Dolgii, A. V. Kozlov
Using of laser scanning survey of barrow for deformation monitoring
2012 A. V. Kovyazin
Physical modeling during scientific following of subway structures underground construction in condition of Saint Petersburg
2012 Yu. S. Frolov, A. N. Konkov, A. A. Larionov
Look-ahead estimation of consequences mines works under high-voltage line of electric transfers and monitoring behind their condition
2012 V. N. Gusev, A. S. Mironov, V. L. Trushko, Nguen Suan Bak