Submit an Article
Become a reviewer
Vol 199
Pages:
78-83
Download volume:
RUS
Article

Methodology of the complex estimation of influence of tectonic disturbances on stability of the rock mass at mining of rock-bump hazardous ore deposits difficult geologic structure

Authors:
D. V. Sidorov
About authors
  • Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2011-11-19
Date accepted:
2012-01-20
Date published:
2012-12-29

Abstract

Positions of methodology of a complex estimation of influence of tectonic disturbances on stability of a rock mass for conditions of mining of ore deposits of a difficult geologic structure are considered. Degree of stability of a rock mass and constructive elements of mining methods in zones of influence of tectonic disturbances is estimated on size of an increment of stresses from action of motions on a contact surface of a tectonic disturbance.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
Methodology tectonic disturbances destruction zones a rock mass ore deposit stresses movings dynamic pressure
Go to volume 199

References

  1. Bezuhov N.I. Bases of the theory of elasticity, plas-ticity and creep. М, 1966.
  2. Sidorov D.V. To calculation of stresses in bearing elements of chamber-and-pillar mining method // The moun-tain information-analytical bulletin. 1999.
  3. Timoshenko S.P., Guder J. The elasticity theory.Moscow, 1975.

Similar articles

Determination of astronomical azimuth for mining and underground workings support
2012 I. S. Pandul
Investigation of the parameters of stressstate nearbord arrays based sequence miningcombined with open-underground mining diamond mine
2012 A. G. Protosenya, A. D. Kuranov, A. N. Shokov
Efficient application of laser scanning system
2012 E. A. Nesterenko
Automatic interpretation technology of aerial and satellite images according to different methods of land cover for protected areas
2012 A. A. Bogolyubova
Analysis of load formation on lining of tunnel constructed in soil with nonlinear behavior
2012 A. G. Protosenya, V. I. Semenov, I. K. Suprun
Evaluation of the stability of slopes with using native and foreign software
2012 A. M. Mochalov, S. A. Ishutin, A. A. Pavlovich, R. Yu. Sapachev