Submit an Article
Become a reviewer
Vol 199
Pages:
190
Download volume:

Settlement-free technologies in the construction of the Saint Petersburg subway

Authors:
K. P. Bezrodnyi1
A. I. Salan2
V. A. Maslak3
V. A. Markov4
M. O. Lebedev5
About authors
  • 1 — «Lenmetrogiprotrans» OJSC
  • 2 — «Lenmetrogiprotrans» OJSC
  • 3 — «Lenmetrogiprotrans» OJSC
  • 4 — «Lenmetrogiprotrans» OJSC
  • 5 — «Lenmetrogiprotrans» OJSC
Date submitted:
2011-11-26
Date accepted:
2012-01-13
Date published:
2012-05-01

Abstract

Everywhere in Saint Petersburg the top strata are represented  by quaternary deposits, and  the ground water level is approximately 2,5 m down from the surface. Below the quaternary deposits, at depths of 40 to 60 m, are Cambrian (Proterozoic) clays. There are many ancient buildings of a historic and architectural value on the day surface that cannot tolerate day surface settlements. The construction of underground stations, and especially inclined escalator tunnels, causes surface settlements. Technologies of construction of escalator tunnels and station tunnels have been developed in Saint Petersburg to minimize such day surface settlements.

Go to volume 199

Similar articles

Rationale for assessing the degree of fracturing rock mass by gpr based on mathematical modeling
2012 V. V. Glazunov, S. M. Danilev
Efficient application of laser scanning system
2012 E. A. Nesterenko
The way of pipeline construction in areas of high seismic activity
2012 A. K. Nikolaev, V. P. Dokukin, O. F. Putikov
Geometric features of rounded crystals
2012 A. I. Glazov
Modern monitoring systems of displacements and deformations at building of underground constructions
2012 E. M. Volokhov, S. Yu. Novozhenin, Nguen Suan Bak
Method for determining the vertical and strain displacement using laser-scanning systems
2012 V. N. Gusev, M. G. Vystrchil