Submit an Article
Become a reviewer
V. A. Markov
V. A. Markov
«Lenmetrogiprotrans» OJSC
«Lenmetrogiprotrans» OJSC

Articles

Geotechnology for development of solid mining fields
  • Date submitted
    2011-11-26
  • Date accepted
    2012-01-13
  • Date published
    2012-05-01

Settlement-free technologies in the construction of the Saint Petersburg subway

Article preview

Everywhere in Saint Petersburg the top strata are represented  by quaternary deposits, and  the ground water level is approximately 2,5 m down from the surface. Below the quaternary deposits, at depths of 40 to 60 m, are Cambrian (Proterozoic) clays. There are many ancient buildings of a historic and architectural value on the day surface that cannot tolerate day surface settlements. The construction of underground stations, and especially inclined escalator tunnels, causes surface settlements. Technologies of construction of escalator tunnels and station tunnels have been developed in Saint Petersburg to minimize such day surface settlements.

How to cite: Bezrodnyi K.P., Salan A.I., Maslak V.A., Markov V.A., Lebedev M.O. Settlement-free technologies in the construction of the Saint Petersburg subway // Journal of Mining Institute. 2012. Vol. 199. p. 190.