Submit an Article
Become a reviewer
Vol 199
Pages:
365-369
Download volume:
RUS
Article

Algorithm and characterization program of downhole electrosteamgenerator for heat treatment on high viscosity oil recervoirs

Authors:
E .A. Zagrivnyi1
V. O. Zyrin2
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — post-graduate student National Mineral Resources University (Mining University)
Date submitted:
2011-11-29
Date accepted:
2012-01-20
Date published:
2012-12-29

Abstract

In paper are shown the results of creation calculation algorithm and calculation main parameters for downhole electrosteamgeneratos for heat treatment of high-viscosity oil reservoirs. The example of characterization results for Usinskoye oil field.

Область исследования:
(Archived) Geotechnology for development of liquid and gas mining fields
Keywords:
high viscosity oil characterization algorithm calculation program electrosteamgenerator
Funding:

None

Go to volume 199

References

  1. Conception of state management in rational oil re-sources using / ОАО «VNIINEFT». Moscow, 2005.
  2. Macarevich V.N., Prischepa О.М., Davidenko B.I.etc. Small and hardextracted oil fields of North-West Russia // OilGasIndustry. 2006. N 4 (24).
  3. Patent 2208145 RF. Device for thermal treatment in bottomhole zone / V.S.Litvinenko, B.B.Cudryashov, G.N.So loviev, E.А.Zagrivniy. Publ.10.07.03. N 15.
  4. Patent 2266401 RF. Heat processing techniquesfor bottom hole zone / E.A.Zagrivniy, S.N.Bataev. Publ.20.10.05. N 35.
  5. Zagrivniy E.A., Kozyaruk A.E., Malarev V.I., Melnikovs E.E. Perspective of using the electrothermal com-plexes for encreasing high oil viscosity extraction // Electrotechnic. 2010. N 1.

Similar articles

Features of pumping of the liquefied hydrocarbonic gases on pipelines
2012 E. I. Krapivskii, O. F. Putikov, V. M. Pisarevskii
Rationale for assessing the degree of fracturing rock mass by gpr based on mathematical modeling
2012 V. V. Glazunov, S. M. Danilev
Application of radar scanning system GPRI-2 for monitoring the eath’s surface displacement
2012 M. G. Mustafin, A. K. Omarova, D. V. Mozer
Building of construction pit and investigation of displacement wall of the secant pile
2012 S. V. Stepanenko
Formation of stressed state in temporary tunnel support when constructing a traffic tunnel of north caucasus railway near the slope
2012 M. O. Lebedev
Use of hydrogeomechanical monitoring during shielding tunnel for underground station оf Saint Petersburg subway «Admiralteiskaya»
2012 Yu. A. Norvatov, I. B. Petrova, M. V. Sergutin