Submit an Article
Become a reviewer
Vol 199
Pages:
325-328
Download volume:
RUS
Article

The calculation of accuracy of breaking the network using satellite navigation systems

Authors:
V. G. Potyukhlyaev
About authors
  • Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2011-11-24
Date accepted:
2012-01-16
Date published:
2012-12-29

Abstract

Data is expounded about the modern production technology of marking works at building various objects, including those in mining industry with the use of satellite navigating systems and electron-optical devices. There are examples of accuracy calculation on constructing network of a building site proceeding from building admissions with the subsequent moving of starting points on wall signs.

Область исследования:
(Archived) Engineering geodesy and urban cadastre
Keywords:
geodetic marking works in building using of modern electron-optical and electronic devices accuracy calculation
Funding:

None

Go to volume 199

References

  1. GOST 21779-82. Norms of accuracy in modular building. Technological admissions. Мoscow: Gosstandart, 1983.
  2. A management by calculation of accuracy of geodetic works in industrial building / Central administrative board of a geodesy and cartography at Ministerial council of the USSR. Мoscow: Nedra, 1979. 55 p.
  3. A management on creation and reconstruction of city geodetic networks with use of satellite systems GLONASS/GPS / CNIIGAiK. Мoscow, 2003. 62 p.
  4. SNiP 3.01.03-84. Geodetic works in building / Gos stroy of the USSR; CITP Gosstroy of the USSR. Мoscow , 1985. 28 p.

Similar articles

Modern monitoring systems of displacements and deformations at building of underground constructions
2012 E. M. Volokhov, S. Yu. Novozhenin, Nguen Suan Bak
Valuation of sustainable of pit wall based on data of digital photography of outcrop surfaces
2012 M. G. Mustafin, A. P. Sannikova
Modeling of stress-strain state of ore massive Yakovlevsky caused by mining works under the protection ceiling
2012 O. V. Trushko, A. V. Streletskii
Geomechanical justification of design parameters of room-and-pillar mining system for designing оf deep-lying horizons of SYBR
2012 D. V. Sidorov
Historical analysis of the system of estimation and expert’s examination of explored ore reserves in Russia
2012 A. V. Kozlov, V. A. Stepanov, I. G. Kiryakova, A. N. Evdokimov
About the problem of shafts projecting and building in the conditions of modern market relations
2012 F. I. Yagodkin, V. A. Kurnakov, M. S. Pleshakov