The prediction technics of tunnel sets with complex three dimensional configuration stress state with allowance for relative influence and building sequence
About authors
- 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
- 2 — Ph.D. assistant lecturer National Mineral Resources University (Mining University)
- 3 — post-graduate student National Mineral Resources University (Mining University)
Abstract
The three dimensional stress distribution in tunnel set with allowance for relative influence and building sequence is investigated. To complete the task the finite elements analysis was used. The values of stress concentration factor and conformities of stress distribution in the «lining – mass» system are estimated. The relative influence of each tunnel in tunnel set with allowance for building sequence is identified.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
tunnel
tunnel set
stress
displacement
concentration factor
permanent lining
chamber
drift
cross slit
Funding:
None
References
- Bulichev N.S. Mechanics of underground constructions: Textbook. Moscow, 1994.
Similar articles
Formation of stressed state in temporary tunnel support when constructing a traffic tunnel of north caucasus railway near the slope
2012 M. O. Lebedev
Look-ahead estimation of consequences mines works under high-voltage line of electric transfers and monitoring behind their condition
2012 V. N. Gusev, A. S. Mironov, V. L. Trushko, Nguen Suan Bak
On cosmic rotation-pulsatory cycles of the Earth and the natural-technogeneous status of objects in underground space under conditions of geodynamic instability and solar depression in 1982-2065
2012 B. G. Tarasov, E. K. Melnikov, L. V. Bugaenko
The technics of mutual influenced tunnel’s temporary support stress-strain state prediction with allowance for building technology
2012 A. G. Protosenya, N. A. Belyakov