About the problem of shafts projecting and building in the conditions of modern market relations
About authors
- 1 — Ph.D., Dr.Sci. professor STC «Science and Practice»
- 2 — Ph.D. associate professor Shakhty Institute (BRANCH) of Southe Russian State Technical University (Novocherkassk Polytechnic Institute)
- 3 — Ph.D., Dr.Sci. associate professor Shakhty Institute (BRANCH) of Southe Russian State Technical University (Novocherkassk Polytechnic Institute)
Abstract
Comparative analysis of home and foreign experience of shaft building is fulfilled. Conclusion about perspectiveness of unification of educational, scientific – research and building organizations is made. Concrete examples of cooperation are given.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
Funding:
None
References
- Building norms and Rules II-94-80. Underground Mining Working Out. Moscow, 1982. 31 p.
Similar articles
Безопасные параметры сдвижения земной поверхности при строительстве метрополитена в Санкт-Петербурге
2012 V. P. Khutskii
The prediction technics of tunnel sets with complex three dimensional configuration stress state with allowance for relative influence and building sequence
2012 A. G. Protosenya, N. A. Belyakov, A. D. Kuranov
About determination of potential sliding surface based on stress analysis in pit wall solid
2012 P. I. Yushmanov