Submit an Article
Become a reviewer
Vol 199
Pages:
168-172
Download volume:
RUS
Article

Dynamics in change of stresses in hardly-caving roof and in a supported zone in the course of evolution of structural parameters of rock mass with secondary subsidence

Authors:
B. Yu. Zuev
About authors
  • Ph.D. laboratory head National Mineral Resources University (Mining University)
Date submitted:
2011-11-24
Date accepted:
2012-01-28
Date published:
2012-12-29

Abstract

Physical modeling on equivalent materials with the use of newly-developed stress sensors allows to investigate the geomechanical processes in blocky structures in their evolution during coal seam mining by long stoping faces under complicated geological-and-mining conditions. The results of investigations may be used in selection of optimal parameters of supports.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
evolution of blocky structures hardly-caving roof dynamics in change of stresses
Funding:

None

Go to volume 199

References

  1. Glushikhin F.P. Hardly-controllable roofs in stopingfaces. M., 1970.
  2. Glushikhin F.P. Recommendations on measurement ofstresses in models from equivalent materials / F.P.Glushikhin, B.Yu.Zuev, M.F.Shklyarsky / VNIMI. Leningrad, 1985.
  3. Glushikhin F.P. Measurements of stresses in modelsfrom equivalent materials / F.P.Glushikhin, B.Yu.Zuev, M.F.Shklyarsky, M.S.Zlotnikov // Proc. VNIMI «Prediction of geomechanical processes and rock pressure control at coal mines» / VNIMI. Leningrad, 1985.
  4. Zuev B.Yu. Instruction for operation of microdynamometers for the determination of stresses in fine dispersion media / VNIMI. Leningrad, 1989.

Similar articles

Stress and strain state of «soil – pile foundations» for varios stages of high-rise building construction
2012 D. A. Potemkin, P. A. Demenkov, V. N. Ochnev, A. D. Kuranov
Безопасные параметры сдвижения земной поверхности при строительстве метрополитена в Санкт-Петербурге
2012 V. P. Khutskii
Land measuring at substracture construction of Mariinsky theatre second stage in Saint Petersburg
2012 D. A. Afonin, E. S. Bogomolova, M. Ya. Bryn, D. V. Krashenitsin, O. P. Sergeev, E. G. Tolstov
Experience of works on the waterproofing of underground constructions
2012 V. M. Dianov, A. V. Savich, K. S. Pashin, S. A. Grafkin
Study of the influence of the form of security structures erected lava following on the mechanism underlying it rocks displacement
2012 V. N. Mokrienko, S. G. Negrei, D. N. Kurdyumov
Building of construction pit and investigation of displacement wall of the secant pile
2012 S. V. Stepanenko