Submit an Article
Become a reviewer
Vol 199
Pages:
118-122
Download volume:
RUS
Article

Multifunctional underground facility comprises a subway transferring node

Authors:
P. A. Demenkov
About authors
  • Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2011-11-02
Date accepted:
2012-01-17
Date published:
2012-12-29

Abstract

Structural spatial concept of subway transferring node for two, three andfour metro lines, which are located in unified underground facility issuggested. Preliminary structural fem design of underground facility isdone. Different construction methods are considered and step by step excavation isincluded in finite element modeling.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
multifunctional underground facility subway station transfernode structural spatial concept finite element method
Funding:

None

Go to volume 199

References

  1. DemenkovP.A., KarasevM.A. Analysis of the stress-strain state of the liningdrop shaftsmultipurposeunderground complex // Proceedings ofthe 9th InternationalScientific Conference. «The developmentof mineralresources in the North: problems and solutions». Vorkuta, 2011.
  2. Kulagin N.I. Interchangenodesformetro linesdeepfoundation. Moscow, 2000.
  3. Tetior A.N., Loginov V.F. Designand construction ofundergroundbuildingsand structures. Minsk,1990.
  4. Demenkov P.A, Karasev M.A., Jendrys M. Ocena stanów naprężeniowo-odkształceniowych w obudowie wielofunkcyjnego kompleksu podziemnego połączonego ze stacją metra // Gornictwoigeologia. Kwartalnik. Gliwice, 2011.

Similar articles

Historical analysis of the system of estimation and expert’s examination of explored ore reserves in Russia
2012 A. V. Kozlov, V. A. Stepanov, I. G. Kiryakova, A. N. Evdokimov
The technics of mutual influenced tunnel’s temporary support stress-strain state prediction with allowance for building technology
2012 A. G. Protosenya, N. A. Belyakov
Prediction of the mine working stability in the massif which are crossing zone of weakening
2012 M. G. Popov
Experience of works on the waterproofing of underground constructions
2012 V. M. Dianov, A. V. Savich, K. S. Pashin, S. A. Grafkin
Calculation of parameters of new method of repair of making
2012 N. N. Kasyan, I. G. Sakhno, A. O. Novikov, N. A. Ovcharenko
Determination of the stress parameters of nearbord areas of open pits, located in highly stressed rock massif
2012 A. D. Kuranov