The way of pipeline construction in areas of high seismic activity

Authors:
A. K. Nikolaev1
V. P. Dokukin2
O. F. Putikov3
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 3 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
Date submitted:
2011-11-11
Date accepted:
2012-01-16
Date published:
2012-12-29

Abstract

The way of pipeline construction in areas of high seismic activity. Plates, which located on the ground surface and fixed in the ground by means of four supports, are used to compensate for the seismic loads. On each shoulder by a hinge to rotate in a vertical plane passing through the longitudinal axis of the pipe installed two-arm lever, one arm of which is oriented perpendicular to the longitudinal axis, and its hinged to tie attached to it, and the second arm is oriented at a right angle to the shoulder is directed along the axis of the pipeline and is pivotally connected to the rod.

Область исследования:
(Archived) Geotechnology for development of liquid and gas mining fields
Keywords:
gas pipeline oil pipeline pipeline
Funding:

None

Go to volume 199

References

  1. Nikolaev A.K. Hydrotransport in difficult climatic conditions. Saint Petersburg, 2004.
  2. Savinov O.A. Seismic resistance of main pipelinesand plant facilities in oil and gas industry. Moscow, 1980.
  3. Pat. 2250409 РФ. Method of laying undergroundpipeline in seismic zones / Kh.K.Mukhametdinov. Publ. 20.04.2005. N 11.
  4. Pat. 2453755 РФ. Method of laying underground pipeline in areas of high seismic activity / Y.D.Tarasov, A.K.Nikolaev, S.I.Chervonny, K.V.Bykov. Publ. 20.06.2012. N 17.

Similar articles

Land measuring in lay-out of forest lands
2012 V. F. Kovyazin
Calculation of parameters of new method of repair of making
2012 N. N. Kasyan, I. G. Sakhno, A. O. Novikov, N. A. Ovcharenko
About the problem of shafts projecting and building in the conditions of modern market relations
2012 F. I. Yagodkin, V. A. Kurnakov, M. S. Pleshakov
Building of construction pit and investigation of displacement wall of the secant pile
2012 S. V. Stepanenko
Look-ahead estimation of consequences mines works under high-voltage line of electric transfers and monitoring behind their condition
2012 V. N. Gusev, A. S. Mironov, V. L. Trushko, Nguen Suan Bak
Rationale for assessing the degree of fracturing rock mass by gpr based on mathematical modeling
2012 V. V. Glazunov, S. M. Danilev