Submit an Article
Become a reviewer
Vol 199
Pages:
301
Download volume:
RUS

Creation of the geodetic marking network fixed by reflective sheet

Authors:
D. A. Afonin
About authors
  • Petersburg State Transport University
Date submitted:
2011-11-14
Date accepted:
2012-01-19
Date published:
2012-12-29

Abstract

Presents the results and findings of experimental studies of reflective characteristics for individual systems «total station – reflective sheet». For example,  the geodesic marking network at object «Construction of the 2nd stage of the Mariinsky theatre, St.-Petersburg» peculiarities of the development of geodetic marking networks, fixed reflective sheet. In particular in the framework of the method of indirect trilateration  the necessity of planning the locations of the total station (stations), the algorithm of search data stations and presents the results of the  use of this algorithm for the considered network.

Афонин Д.А. Построение геодезической разбивочной сети, закрепляемой пленочными отражателями // Записки Горного института. 2012. Т. 199 . С. 301.
Afonin D.A. Creation of the geodetic marking network fixed by reflective sheet // Journal of Mining Institute. 2012. Vol. 199 . p. 301.
Go to volume 199

References

  1. Большаков В.Д. Справочник геодезиста / В.Д.Большаков, Г.П.Левчук, Г.В.Багратуни. М.: Недра, 1975. 1056 с.
  2. Габович И. Теорема о трех синусах // Квант. 1986. № 1. С.71-72.
  3. Строительные нормы и правила. Геодезические работы в строительстве (СНиП 3.01.01-84). М.: Госстрой, 1995. 27 с. Взамен СНиП III-2-75; введ. 04.02.85.
  4. Толстов Е.Г. Оперативный контроль исходной разбивочной сети (на примере строительства второй сцены Мариинского театра) / Е.Г.Толстов, Д.В.Крашеницин // Современные проблемы инженерной геодезии: Тр. международ. научно-практической конференции 15-17 октября 2009 г. / ПГУПС. СПб, 2010. С.190-194.

Similar articles

Modeling of stress-strain state of ore massive Yakovlevsky caused by mining works under the protection ceiling
2012 O. V. Trushko, A. V. Streletskii
Look-ahead estimation of consequences mines works under high-voltage line of electric transfers and monitoring behind their condition
2012 V. N. Gusev, A. S. Mironov, V. L. Trushko, Nguen Suan Bak
The way of pipeline construction in areas of high seismic activity
2012 A. K. Nikolaev, V. P. Dokukin, O. F. Putikov
Standard and methodical support of estimation of adverse effect of underground construction and monitoring of deformations for conditions of Saint-Petersburg
2012 E. M. Volokhov, S. N. Zelentsov, V. P. Khutskii
Perspectives of further development of technics and technology of shafts building in Russia with consideration of world technologies
2012 V. A. Kurnakov, M. S. Pleshakov
Complex method of assesing mechanical condition of rocks in vicinity storehouses of radioactive waste
2012 O. V. Kovalev, S. P. Mozer, I. Yu. Tkhorikov