Submit an Article
Become a reviewer
Vol 199
Pages:
349-350
Download volume:
RUS
Article

About determination of potential sliding surface based on stress analysis in pit wall solid

Authors:
P. I. Yushmanov
About authors
  • post-graduate student National Mineral Resources University (Mining University)
Date submitted:
2011-11-03
Date accepted:
2012-01-19
Date published:
2012-12-29

Abstract

The paper gives description of method of estimation of pit wall based on simulation of sliding surface. The calculation example is given.

Область исследования:
(Archived) Engineering geodesy and urban cadastre
Keywords:
earth surface movement pit wall observations deformations stress and strain state mechanical-and-physical properties
Funding:

None

Go to volume 199

References

  1. Мustafin M.G. Estimation of having an effect of advance rate of mining face on variation of dynamics of stress of working selvedge and character of underworked solid mass movement // Modern problems of safe coal mining / VNIMI. Saint Petersburg, 2006. P.172-177.
  2. Rules of slope stabilization in coal strip mines /VNIMI. Saint Petersburg, 1998.
  3. Rules of protection of constructions and natural objects from harmful influence of underground mountain workings out on coal deposits / VNIMI. Saint Petersburg, 1998. 291 p.
  4. Computational methods in rock bump mechanics: Reference aid / I.M.Petuchov, A.M.Linkov, V.S.Sidorov and others. Мoscow: Nedra, 1992. 256 p.

Similar articles

Use of hydrogeomechanical monitoring during shielding tunnel for underground station оf Saint Petersburg subway «Admiralteiskaya»
2012 Yu. A. Norvatov, I. B. Petrova, M. V. Sergutin
Statistical evaluation of the energy rates of the surface miner MTS-250 (Germany)
2012 A. A. Grabsky
Numerical modeling of deep excavation structures behavior during construction
2012 A. G. Protosenya, D. A. Potemkin, S. V. Stepanenko
Determination of the stress parameters of nearbord areas of open pits, located in highly stressed rock massif
2012 A. D. Kuranov
Development of the weighted biopolimer drilling mud for workover
2012 Vladimir S. Litvinenko, N. I. Nikolaev
Building of construction pit and investigation of displacement wall of the secant pile
2012 S. V. Stepanenko