Statistical evaluation of the energy rates of the surface miner MTS-250 (Germany)

Authors:
A. A. Grabsky
About authors
  • Ph.D. professor Moscow State Mining University
Date submitted:
2011-11-11
Date accepted:
2012-01-12
Date published:
2012-12-29

Abstract

Statistical estimation and statistical modeling of screw and cutter dynamic system that controls operation of the screw and vibrological impulsator of the surface miner of the type MTS-250 (Germany) is given. The statistical modeling is carried out using a digital model developed by the author as of the whole system and its individual components. This allows to vary the operating parameters of the surface miner and to evaluate the energy input per amount of the mined rock during the time of its work. This will eventually minimize the operating parameters of the surface miner.

Область исследования:
(Archived) Geotechnology for development of liquid and gas mining fields
Keywords:
screw and cutter surface miner hydraulic motor operating parameters digital model dynamics statistical estimation energy datum capacity
Go to volume 199

References

  1. Grabsky А.А. Analysis of dynamic loading of thescrew and cutter working body of a surface miner by the statistical method // Mining Industry. 2012. No 4 (104). Р.158-160.
  2. Grabsky А.А. Establishment of the differential distribution law of the whole resistance moment on the screw and cutter working body of a surface miner // Mining Industry. 2012. No 5 (105). Р.91-95.
  3. Grabsky А.А. The use of digital simulation in the stability analysis of the dynamical system of a surface miner with screw and cutter working body of the type MTS (Germany) // Volga Region Scientific-technical Newsletter. 2012. No 6. Р.204-211.

Similar articles

Method for determining the vertical and strain displacement using laser-scanning systems
2012 V. N. Gusev, M. G. Vystrchil
Definition of area harmful interference in communications construction underground
2012 M. G. Mustafin, A. S. Naumov
Dynamics in change of stresses in hardly-caving roof and in a supported zone in the course of evolution of structural parameters of rock mass with secondary subsidence
2012 B. Yu. Zuev
Building of construction pit and investigation of displacement wall of the secant pile
2012 S. V. Stepanenko
Prediction of the mine working stability in the massif which are crossing zone of weakening
2012 M. G. Popov
Analysis of load formation on lining of tunnel constructed in soil with nonlinear behavior
2012 A. G. Protosenya, V. I. Semenov, I. K. Suprun