Building of construction pit and investigation of displacement wall of the secant pile
Authors:
About authors
- head of department Jet Technology and Construction ltd
Abstract
Performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
Funding:
None
References
- Ulitsky V.M. Geotechnical support for urban development / V.M.Ulitsky, A.G.Shashkin, K.G.Shashkin. Saint Petersburg, 2010.
Similar articles
On cosmic rotation-pulsatory cycles of the Earth and the natural-technogeneous status of objects in underground space under conditions of geodynamic instability and solar depression in 1982-2065
2012 B. G. Tarasov, E. K. Melnikov, L. V. Bugaenko
Analysis of load formation on lining of tunnel constructed in soil with nonlinear behavior
2012 A. G. Protosenya, V. I. Semenov, I. K. Suprun
Development of the weighted biopolimer drilling mud for workover
2012 Vladimir S. Litvinenko, N. I. Nikolaev
Land measuring at substracture construction of Mariinsky theatre second stage in Saint Petersburg
2012 D. A. Afonin, E. S. Bogomolova, M. Ya. Bryn, D. V. Krashenitsin, O. P. Sergeev, E. G. Tolstov