Building of construction pit and investigation of displacement wall of the secant pile

Authors:
S. V. Stepanenko
About authors
  • head of department Jet Technology and Construction ltd
Date submitted:
2011-11-27
Date accepted:
2012-01-14
Date published:
2012-12-29

Abstract

Performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
modeling soil pit finite elements method
Funding:

None

Go to volume 199

References

  1. Ulitsky V.M. Geotechnical support for urban development / V.M.Ulitsky, A.G.Shashkin, K.G.Shashkin. Saint Petersburg, 2010.

Similar articles

Determination of astronomical azimuth for mining and underground workings support
2012 I. S. Pandul
Look-ahead estimation of consequences mines works under high-voltage line of electric transfers and monitoring behind their condition
2012 V. N. Gusev, A. S. Mironov, V. L. Trushko, Nguen Suan Bak
Technological parameters of vertical shafts, which are sinking in the presence of oil and gas, are proved
2012 A. Yu. Prokopov, V. L. Sklepchuk
Geometric features of rounded crystals
2012 A. I. Glazov
Modeling of stress-strain state of ore massive Yakovlevsky caused by mining works under the protection ceiling
2012 O. V. Trushko, A. V. Streletskii
Determination of the stress parameters of nearbord areas of open pits, located in highly stressed rock massif
2012 A. D. Kuranov