Building of construction pit and investigation of displacement wall of the secant pile
Authors:
About authors
- head of department Jet Technology and Construction ltd
Abstract
Performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
Funding:
None
References
- Ulitsky V.M. Geotechnical support for urban development / V.M.Ulitsky, A.G.Shashkin, K.G.Shashkin. Saint Petersburg, 2010.
Similar articles
Development of the composition and technology for industrial production of an emulsifier used in oil рroduction for inverse water-in-oil emulsions
2012 N. K. Kondrasheva, M. K. Rogachev
Valuation of sustainable of pit wall based on data of digital photography of outcrop surfaces
2012 M. G. Mustafin, A. P. Sannikova
Evaluation of the stability of slopes with using native and foreign software
2012 A. M. Mochalov, S. A. Ishutin, A. A. Pavlovich, R. Yu. Sapachev
Complex method of assesing mechanical condition of rocks in vicinity storehouses of radioactive waste
2012 O. V. Kovalev, S. P. Mozer, I. Yu. Tkhorikov