Performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
References
- Ulitsky V.M. Geotechnical support for urban development / V.M.Ulitsky, A.G.Shashkin, K.G.Shashkin. Saint Petersburg, 2010.
Similar articles
Determination of the stress parameters of nearbord areas of open pits, located in highly stressed rock massif
2012 A. D. Kuranov
Land measuring at substracture construction of Mariinsky theatre second stage in Saint Petersburg
2012 D. A. Afonin, E. S. Bogomolova, M. Ya. Bryn, D. V. Krashenitsin, O. P. Sergeev, E. G. Tolstov
Physical modeling during scientific following of subway structures underground construction in condition of Saint Petersburg
2012 Yu. S. Frolov, A. N. Konkov, A. A. Larionov
Development of the weighted biopolimer drilling mud for workover
2012 Vladimir S. Litvinenko, N. I. Nikolaev