Building of construction pit and investigation of displacement wall of the secant pile
Authors:
About authors
- head of department Jet Technology and Construction ltd
Abstract
Performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
Funding:
None
References
- Ulitsky V.M. Geotechnical support for urban development / V.M.Ulitsky, A.G.Shashkin, K.G.Shashkin. Saint Petersburg, 2010.
Similar articles
Dynamics in change of stresses in hardly-caving roof and in a supported zone in the course of evolution of structural parameters of rock mass with secondary subsidence
2012 B. Yu. Zuev
Formation and development of mining-and-geological processes in relation to changes in engineering-geological and hydrogeological conditions on Yakovlevsky mine
2012 R. E. Dashko, E. N. Feller
Analysis of load formation on lining of tunnel constructed in soil with nonlinear behavior
2012 A. G. Protosenya, V. I. Semenov, I. K. Suprun