Modeling of stress-strain state of ore massive Yakovlevsky caused by mining works under the protection ceiling

Authors:
O. V. Trushko1
A. V. Streletskii2
About authors
  • 1 — Ph.D. associate professor National Mineral Resources University (Mining University)
  • 2 — post-graduate student National Mineral Resources University (Mining University)
Date submitted:
2011-11-07
Date accepted:
2012-01-28
Date published:
2012-12-29

Abstract

An analysis of field studies for mining of deep shifts frames is presented in this article. A spatial model is developed, the results of mathematical modeling are presented, they are based on finite element method of nonlinear deformed ore body, which includes the system of wide workings on the 6-th block of –370 m horizon of the Yakovlevsky mine, which consistently pass and laid hardening mixture.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
modeling ore massif mine working finite elements method benchmark monitoring ore ceiling
Go to volume 199

References

  1. Trushko V.L., Protosenya A.G., Matveev R.F.,Sovmen Kh.М. Geomechanics and dynamics of the entry of deep mines. Saint Petersburg, 2000.
  2. Protosenya A.G., Petrov D.N., Sinyakin K.G., Martemyanov G.A. The field observation for the processes of settling of the ore ceiling caused by mining works at yakovlevsky deposit // Notes of the Mining Institute. Saint Petersburg, 2011. Vol.190.
  3. Protosenya A.G., Sinyakin K.G. Modeling of thestress strain state of the ore zone of influence of an array of clean-up operations // Notes of the Mining Institute. Saint Petersburg, 2011. Vol.189.

Similar articles

Application of radar scanning system GPRI-2 for monitoring the eath’s surface displacement
2012 M. G. Mustafin, A. K. Omarova, D. V. Mozer
About the problem of shafts projecting and building in the conditions of modern market relations
2012 F. I. Yagodkin, V. A. Kurnakov, M. S. Pleshakov
Dynamics in change of stresses in hardly-caving roof and in a supported zone in the course of evolution of structural parameters of rock mass with secondary subsidence
2012 B. Yu. Zuev
Building of construction pit and investigation of displacement wall of the secant pile
2012 S. V. Stepanenko
Use of hydrogeomechanical monitoring during shielding tunnel for underground station оf Saint Petersburg subway «Admiralteiskaya»
2012 Yu. A. Norvatov, I. B. Petrova, M. V. Sergutin
Numerical modeling of deep excavation structures behavior during construction
2012 A. G. Protosenya, D. A. Potemkin, S. V. Stepanenko