Building of underground construction protected enclosing wall and method of displacement forecast of the soil

Authors:
M. G. Popov1
S. V. Stepanenko2
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — Jet Technology and Construction ltd
Date submitted:
2011-11-30
Date accepted:
2012-01-23
Date published:
2012-12-29

Abstract

The volumetric model taking and performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall. Set out conditions for the construction of the  pit and the main technological  solutions.

Go to volume 199

Similar articles

Definition of area harmful interference in communications construction underground
2012 M. G. Mustafin, A. S. Naumov
The way of pipeline construction in areas of high seismic activity
2012 A. K. Nikolaev, V. P. Dokukin, O. F. Putikov
The technics of mutual influenced tunnel’s temporary support stress-strain state prediction with allowance for building technology
2012 A. G. Protosenya, N. A. Belyakov
Experience of works on the waterproofing of underground constructions
2012 V. M. Dianov, A. V. Savich, K. S. Pashin, S. A. Grafkin
The prediction technics of tunnel sets with complex three dimensional configuration stress state with allowance for relative influence and building sequence
2012 A. G. Protosenya, N. A. Belyakov, A. D. Kuranov
Calculation of parameters of new method of repair of making
2012 N. N. Kasyan, I. G. Sakhno, A. O. Novikov, N. A. Ovcharenko