Building of underground construction protected enclosing wall and method of displacement forecast of the soil
About authors
- 1 — Ph.D. assistant lecturer National Mineral Resources University (Mining University)
- 2 — head of department Jet Technology and Construction ltd
Abstract
The volumetric model taking and performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall. Set out conditions for the construction of the pit and the main technological solutions.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
References
- Geotechnical support for urban development / V.M.Ulitsky, A.G.Shashkin, K.G.Shashkin. Saint Petersburg, 2010.
Similar articles
Hydrogeological conditions effect on safety of underground space expansion during transport tunnel construction
2012 R. E. Dashko, P. V. Kotyukov, A. V. Shidlovskaya
Development of the weighted biopolimer drilling mud for workover
2012 Vladimir S. Litvinenko, N. I. Nikolaev
Formation and development of mining-and-geological processes in relation to changes in engineering-geological and hydrogeological conditions on Yakovlevsky mine
2012 R. E. Dashko, E. N. Feller
Methodology of the complex estimation of influence of tectonic disturbances on stability of the rock mass at mining of rock-bump hazardous ore deposits difficult geologic structure
2012 D. V. Sidorov