Submit an Article
Become a reviewer
Vol 199
Pages:
55-59
Download volume:
RUS
Article

Building of underground construction protected enclosing wall and method of displacement forecast of the soil

Authors:
M. G. Popov1
S. V. Stepanenko2
About authors
  • 1 — Ph.D. assistant lecturer National Mineral Resources University (Mining University)
  • 2 — head of department Jet Technology and Construction ltd
Date submitted:
2011-11-30
Date accepted:
2012-01-23
Date published:
2012-12-29

Abstract

The volumetric model taking and performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall. Set out conditions for the construction of the pit and the main technological solutions.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
modeling soil pit finite elements method the pile
Go to volume 199

References

  1. Geotechnical support for urban development / V.M.Ulitsky, A.G.Shashkin, K.G.Shashkin. Saint Petersburg, 2010.

Similar articles

Dynamics in change of stresses in hardly-caving roof and in a supported zone in the course of evolution of structural parameters of rock mass with secondary subsidence
2012 B. Yu. Zuev
Analysis of load formation on lining of tunnel constructed in soil with nonlinear behavior
2012 A. G. Protosenya, V. I. Semenov, I. K. Suprun
Numerical modeling of tunnel yield element behaviour
2012 M. A. Karasev, N. A. Belyakov
Numerical modeling of deep excavation structures behavior during construction
2012 A. G. Protosenya, D. A. Potemkin, S. V. Stepanenko
Determining of encumbranses on the territory of Kirovsky district of Saint Petersburg
2012 E. N. Bykova, Yu. V. Chernetskaya
Changes in strain and slope geostructural block in the preparation and realization of technogenic eathquake
2012 A. A. Kozyrev, M. M. Kagan, K. N. Konstantinov, D. V. Zhirov