Building of underground construction protected enclosing wall and method of displacement forecast of the soil
About authors
- 1 — Ph.D. assistant lecturer National Mineral Resources University (Mining University)
- 2 — head of department Jet Technology and Construction ltd
Abstract
The volumetric model taking and performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall. Set out conditions for the construction of the pit and the main technological solutions.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
References
- Geotechnical support for urban development / V.M.Ulitsky, A.G.Shashkin, K.G.Shashkin. Saint Petersburg, 2010.
Similar articles
Determining of encumbranses on the territory of Kirovsky district of Saint Petersburg
2012 E. N. Bykova, Yu. V. Chernetskaya
Investigation of the parameters of stressstate nearbord arrays based sequence miningcombined with open-underground mining diamond mine
2012 A. G. Protosenya, A. D. Kuranov, A. N. Shokov
Development of the weighted biopolimer drilling mud for workover
2012 Vladimir S. Litvinenko, N. I. Nikolaev
Experience of works on the waterproofing of underground constructions
2012 V. M. Dianov, A. V. Savich, K. S. Pashin, S. A. Grafkin