Building of underground construction protected enclosing wall and method of displacement forecast of the soil
About authors
- 1 — Ph.D. assistant lecturer National Mineral Resources University (Mining University)
- 2 — head of department Jet Technology and Construction ltd
Abstract
The volumetric model taking and performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall. Set out conditions for the construction of the pit and the main technological solutions.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
Funding:
None
References
- Geotechnical support for urban development / V.M.Ulitsky, A.G.Shashkin, K.G.Shashkin. Saint Petersburg, 2010.
Similar articles
Hydrogeological conditions effect on safety of underground space expansion during transport tunnel construction
2012 R. E. Dashko, P. V. Kotyukov, A. V. Shidlovskaya
Evaluation of the stability of slopes with using native and foreign software
2012 A. M. Mochalov, S. A. Ishutin, A. A. Pavlovich, R. Yu. Sapachev
Historical analysis of the system of estimation and expert’s examination of explored ore reserves in Russia
2012 A. V. Kozlov, V. A. Stepanov, I. G. Kiryakova, A. N. Evdokimov
Physical modeling during scientific following of subway structures underground construction in condition of Saint Petersburg
2012 Yu. S. Frolov, A. N. Konkov, A. A. Larionov