Submit an Article
Become a reviewer
Vol 199
Pages:
134-140
Download volume:
RUS
Article

Geomechanical justification of design parameters of room-and-pillar mining system for designing оf deep-lying horizons of SYBR

Authors:
D. V. Sidorov
About authors
  • Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2011-11-08
Date accepted:
2012-01-18
Date published:
2012-12-29

Abstract

Results of the analysis of factors of mining operations influencing safe conducting are resulted. Technological solutions on the pressure control, allowing messages mining operations on the big depths in rock-bump hazardous conditions are considered. Methodical positions and results of definition of parameters of constructive elements of systems of minings for conditions North Ural bauxite deposits are resulted.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
chamber-and-pillar mining method a goaf a pillar dynamic pressure
Funding:

None

Go to volume 199

References

  1. Conducting in hard- rock mechanics: the Lane with English / Under the editorship of H.Bok. Moscow, 1983.
  2. The instruction on safe conducting mining operations on ore and nonmetallic deposits, objects of building of the underground constructions inclined and prone to rock -bumps. RD 06-329- 99. Moscow, 2003.
  3. Petuhov I.M., Linkov А.М. Mechanics of rock bumps and outbursts. Moscow, 1983.
  4. Durability and deformability of rocks / Y.M.Kartashov. B.V.Matveev, G.V.Mikheyev, A.B.Fadeev. Moscow.
  5. Settlement methods in the mechanic of rock bumps and outbursts: The handbook / I.M.Petrov, A.M.Linkov, V.S.Sidorov ,etc. Moscow, 1992.

Similar articles

Allocation of areas under the coal-mining industry
2012 E. N. Bykova
Some problems of production of mining surveyor documentation in electronic-digital format
2012 G. P. Zhukov, I. P. Ivanov, L. R. Bazykina
Land measuring at substracture construction of Mariinsky theatre second stage in Saint Petersburg
2012 D. A. Afonin, E. S. Bogomolova, M. Ya. Bryn, D. V. Krashenitsin, O. P. Sergeev, E. G. Tolstov
Estimation of condition tubbing lining escalator tunnel of metro station «Admiralty» by results of lazerno-scanning survey
2012 V. K. Nosov
Dynamics in change of stresses in hardly-caving roof and in a supported zone in the course of evolution of structural parameters of rock mass with secondary subsidence
2012 B. Yu. Zuev
Hydrogeological conditions effect on safety of underground space expansion during transport tunnel construction
2012 R. E. Dashko, P. V. Kotyukov, A. V. Shidlovskaya